Congo vs Puerto Rico: Dealing with construction permits: Time

Congo
164 days
in 2019
Puerto Rico
165 days
in 2019
Congo rank
66th
Puerto Rico rank
64th

Dealing with construction permits: Time over time

  • Congo
  • Puerto Rico
050100150200200520122019

How they compare

Puerto Rico currently reports 165 days against 164 days in Congo, a difference of 1 days.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Congo ahead.

Congo ranks 66th and Puerto Rico ranks 64th of 185 countries.

Across the 2 decades both report, Congo averaged higher in 1 and Puerto Rico in 1.

Head to head by decade

Decade Congo Puerto Rico Difference Ahead
2000s 179 days 175 days 4 days Congo
2010s 168.5 days 173.8 days 5.3 days Puerto Rico

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Congo or Puerto Rico?
Puerto Rico, at 165 days against 164 days in Congo as of 2019.
What is the difference in dealing with construction permits: time between Congo and Puerto Rico?
1 days, with Puerto Rico ahead.
How many years of comparable data are there for Congo and Puerto Rico?
15 years are reported by both, from 2005 to 2019.
How do Congo and Puerto Rico rank globally for dealing with construction permits: time?
Congo ranks 66th and Puerto Rico ranks 64th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.