Dealing with construction permits: Time (days) (Time days) in Congo

Congo: Dealing with construction permits: Time was 164 days in 2019. ▼ Falling

Latest (2019)
164 days
Change on year
unchanged
World rank
68th
of 188 countries
All-time high
179 days
in 2005
All-time low
164 days
in 2013
Years of data
15
2005–2019

Dealing with construction permits: Time in Congo, 2005–2019

0501001502002005201220192005: 179 days2006: 179 days2007: 179 days2008: 179 days2009: 179 days2010: 179 days2011: 179 days2012: 179 days2013: 164 days2014: 164 days2015: 164 days2016: 164 days2017: 164 days2018: 164 days2019: 164 days

Source: World Bank. Measured in days.

Analysis

In 2019, dealing with construction permits: time in Congo stood at 164 days. That is the lowest value across all 15 years on record.

That represents a change of down 8.4% over ten years.

Over the whole period, dealing with construction permits: time in Congo peaked at 179 days in 2005 and was at its lowest, 164 days, in 2013.

Congo ranks 68th of 188 countries on this measure, in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Dealing with construction permits: Time in Congo, year by year

Annual values for Dealing with construction permits: Time (days) in Congo, 2005 to 2019.
Year days Change
2005 179 days —
2006 179 days +0.0%
2007 179 days +0.0%
2008 179 days +0.0%
2009 179 days +0.0%
2010 179 days +0.0%
2011 179 days +0.0%
2012 179 days +0.0%
2013 164 days -8.4%
2014 164 days +0.0%
2015 164 days +0.0%
2016 164 days +0.0%
2017 164 days +0.0%
2018 164 days +0.0%
2019 164 days +0.0%

Congo compared with similar countries

  • Congo's 164 days is above the median for lower middle income countries, which is 159 days, 1.0× the median. (47 countries reporting)
  • Congo's 164 days is above the median for Sub-Saharan Africa, which is 143.5 days, 1.1× the median. (46 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 179 days 179 days 179 days 5
2010s 168.5 days 164 days 179 days 10

Countries ranked near Congo

  1. 65 Vietnam 166 days compare
  2. 66 Puerto Rico 165 days compare
  3. 67 Russia 164.5 days compare
  4. 68 Ireland 164 days compare
  5. 70 Cote d'Ivoire 163 days compare
  6. 71 Netherlands 161 days compare

See the full ranking of 188 places →

More private sector data for Congo

All data for Congo →

Frequently asked questions

What is dealing with construction permits: time in Congo?
Dealing with construction permits: time in Congo was 164 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Congo?
The highest recorded value was 179 days in 2005.
What is the lowest dealing with construction permits: time recorded in Congo?
The lowest recorded value was 164 days in 2013.
How does Congo rank for dealing with construction permits: time?
Congo ranks 68th out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Congo?
Over the last ten years it is down 8.4%. The long-run trend across the full record is falling.
Where does this Congo data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Congo. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/congo-rep/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/congo-rep/">Dealing with construction permits: Time in Congo</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.