Congo, Rep. vs Russian Federation: Dealing with construction permits: Time

Congo, Rep.
164 days
in 2019
Russian Federation
164.5 days
in 2019
Congo, Rep. rank
66th
Russian Federation rank
65th

Dealing with construction permits: Time over time

  • Congo, Rep.
  • Russian Federation
200400600200520122019

How they compare

Russian Federation currently reports 164.5 days against 164 days in Congo, Rep., a difference of 0.5 days.

Across all 15 years both countries report, Russian Federation has been ahead every year.

Congo, Rep. ranks 66th and Russian Federation ranks 65th of 185 countries.

Russian Federation has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Congo, Rep. Russian Federation Difference Ahead
2000s 179 days 666.8 days 487.8 days Russian Federation
2010s 168.5 days 267.81 days 99.31 days Russian Federation

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Congo, Rep. or Russian Federation?
Russian Federation, at 164.5 days against 164 days in Congo, Rep. as of 2019.
What is the difference in dealing with construction permits: time between Congo, Rep. and Russian Federation?
0.5 days, with Russian Federation ahead.
How many years of comparable data are there for Congo, Rep. and Russian Federation?
15 years are reported by both, from 2005 to 2019.
How do Congo, Rep. and Russian Federation rank globally for dealing with construction permits: time?
Congo, Rep. ranks 66th and Russian Federation ranks 65th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.