Congo vs Russia: Dealing with construction permits: Time (days) (Time days)
Dealing with construction permits: Time (days) (Time days) over time
- Congo
- Russia
How they compare
Russia currently reports 164.5 days against 164 days in Congo, a difference of 0.5 days.
Across all 15 years both countries report, Russia has been ahead every year.
Congo ranks 68th and Russia ranks 67th of 188 countries.
Russia has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Congo | Russia | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 179 days | 666.8 days | 487.8 days | Russia |
| 2010s | 168.5 days | 267.81 days | 99.31 days | Russia |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Congo or Russia?
- Russia, at 164.5 days against 164 days in Congo as of 2019.
- What is the difference in dealing with construction permits: time between Congo and Russia?
- 0.5 days, with Russia ahead.
- How many years of comparable data are there for Congo and Russia?
- 15 years are reported by both, from 2005 to 2019.
- How do Congo and Russia rank globally for dealing with construction permits: time?
- Congo ranks 68th and Russia ranks 67th of 188 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.