Ethiopia vs Poland: Dealing with construction permits: Time (days) (Time days)

Ethiopia
136 days
in 2019
Poland
137 days
in 2019
Ethiopia rank
99th
Poland rank
96th

Dealing with construction permits: Time (days) (Time days) over time

  • Ethiopia
  • Poland
0100200300200520122019

How they compare

Poland currently reports 137 days against 136 days in Ethiopia, a difference of 1 days.

The two have swapped places 2 times across 15 shared years of data; in 2005 it was Poland ahead.

Ethiopia ranks 99th and Poland ranks 96th of 188 countries.

Poland has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Ethiopia Poland Difference Ahead
2000s 142 days 273.6 days 131.6 days Poland
2010s 145.3 days 152.3 days 7 days Poland

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Ethiopia or Poland?
Poland, at 137 days against 136 days in Ethiopia as of 2019.
What is the difference in dealing with construction permits: time between Ethiopia and Poland?
1 days, with Poland ahead.
How many years of comparable data are there for Ethiopia and Poland?
15 years are reported by both, from 2005 to 2019.
How do Ethiopia and Poland rank globally for dealing with construction permits: time?
Ethiopia ranks 99th and Poland ranks 96th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Ethiopia vs Poland: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/ethiopia/poland/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/ethiopia/poland/">Ethiopia vs Poland: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.