Dealing with construction permits: Time (days) (Time days) in Ethiopia

Ethiopia: Dealing with construction permits: Time was 136 days in 2019. ▬ Flat

Latest (2019)
136 days
Change on year
up 1.5%
World rank
99th
of 188 countries
All-time high
149 days
in 2013
All-time low
134 days
in 2018
Years of data
15
2005–2019

Dealing with construction permits: Time in Ethiopia, 2005–2019

0501001502005201220192005: 142 days2006: 142 days2007: 142 days2008: 142 days2009: 142 days2010: 142 days2011: 148 days2012: 148 days2013: 149 days2014: 149 days2015: 149 days2016: 149 days2017: 149 days2018: 134 days2019: 136 days

Source: World Bank. Measured in days.

Analysis

In 2019, dealing with construction permits: time in Ethiopia stood at 136 days.

Compared with earlier readings it is up 1.5% on the previous year and down 4.2% over ten years.

Over the whole period, dealing with construction permits: time in Ethiopia peaked at 149 days in 2013 and was at its lowest, 134 days, in 2018.

Ethiopia ranks 99th of 188 countries on this measure, in the middle of the range.

Dealing with construction permits: Time in Ethiopia, year by year

Annual values for Dealing with construction permits: Time (days) in Ethiopia, 2005 to 2019.
Year days Change
2005 142 days —
2006 142 days +0.0%
2007 142 days +0.0%
2008 142 days +0.0%
2009 142 days +0.0%
2010 142 days +0.0%
2011 148 days +4.2%
2012 148 days +0.0%
2013 149 days +0.7%
2014 149 days +0.0%
2015 149 days +0.0%
2016 149 days +0.0%
2017 149 days +0.0%
2018 134 days -10.1%
2019 136 days +1.5%

Ethiopia compared with similar countries

  • Ethiopia's 136 days is above the median for low income countries, which is 133.5 days, 1.0× the median. (22 countries reporting)
  • Ethiopia's 136 days is below the median for Sub-Saharan Africa, which is 143.5 days, 95% of the median. (46 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 142 days 142 days 142 days 5
2010s 145.3 days 134 days 149 days 10

Countries ranked near Ethiopia

  1. 96 Mongolia 137 days compare
  2. 96 Peru 137 days compare
  3. 96 Poland 137 days compare
  4. 100 Tunisia 133 days compare
  5. 101 Colombia 132 days compare
  6. 101 Ecuador 132 days compare
  7. 101 Honduras 132 days compare

See the full ranking of 188 places →

More private sector data for Ethiopia

All data for Ethiopia →

Frequently asked questions

What is dealing with construction permits: time in Ethiopia?
Dealing with construction permits: time in Ethiopia was 136 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Ethiopia?
The highest recorded value was 149 days in 2013.
What is the lowest dealing with construction permits: time recorded in Ethiopia?
The lowest recorded value was 134 days in 2018.
How does Ethiopia rank for dealing with construction permits: time?
Ethiopia ranks 99th out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Ethiopia?
Over the last ten years it is down 4.2%. The long-run trend across the full record is flat.
Where does this Ethiopia data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Ethiopia. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/ethiopia/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/ethiopia/">Dealing with construction permits: Time in Ethiopia</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.