Finland vs Georgia: Dealing with construction permits: Time

Finland
65 days
in 2019
Georgia
63 days
in 2019
Finland rank
176th
Georgia rank
178th

Dealing with construction permits: Time over time

  • Finland
  • Georgia
50100150200200520122019

How they compare

Finland currently reports 65 days against 63 days in Georgia, a difference of 2 days.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Georgia ahead.

Finland ranks 176th and Georgia ranks 178th of 185 countries.

Georgia has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Finland Georgia Difference Ahead
2000s 64 days 135.3 days 71.3 days Georgia
2010s 64.6 days 68.65 days 4.05 days Georgia

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Finland or Georgia?
Finland, at 65 days against 63 days in Georgia as of 2019.
What is the difference in dealing with construction permits: time between Finland and Georgia?
2 days, with Finland ahead.
How many years of comparable data are there for Finland and Georgia?
15 years are reported by both, from 2005 to 2019.
How do Finland and Georgia rank globally for dealing with construction permits: time?
Finland ranks 176th and Georgia ranks 178th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.