Dealing with construction permits: Time (days) (Time days) in Georgia

Georgia: Dealing with construction permits: Time was 63 days in 2019. ▼ Falling

Latest (2019)
63 days
Change on year
unchanged
World rank
181st
of 188 countries
All-time high
197.5 days
in 2005
All-time low
63 days
in 2013
Years of data
15
2005–2019

Dealing with construction permits: Time in Georgia, 2005–2019

501001502002005201220192005: 197.5 days2006: 133.5 days2007: 127.5 days2008: 127.5 days2009: 90.5 days2010: 90.5 days2011: 90 days2012: 65 days2013: 63 days2014: 63 days2015: 63 days2016: 63 days2017: 63 days2018: 63 days2019: 63 days

Source: World Bank. Measured in days.

Analysis

Georgia recorded 63 days for dealing with construction permits: time in 2019. That is the lowest value across all 15 years on record.

The figure is down 30.4% over ten years.

Over the whole period, dealing with construction permits: time in Georgia peaked at 197.5 days in 2005 and was at its lowest, 63 days, in 2013.

Georgia ranks 181st of 188 countries on this measure, in the bottom quarter.

The long-run direction has been consistently falling across the 15 years of available data.

Dealing with construction permits: Time in Georgia, year by year

Annual values for Dealing with construction permits: Time (days) in Georgia, 2005 to 2019.
Year days Change
2005 197.5 days —
2006 133.5 days -32.4%
2007 127.5 days -4.5%
2008 127.5 days +0.0%
2009 90.5 days -29.0%
2010 90.5 days +0.0%
2011 90 days -0.6%
2012 65 days -27.8%
2013 63 days -3.1%
2014 63 days +0.0%
2015 63 days +0.0%
2016 63 days +0.0%
2017 63 days +0.0%
2018 63 days +0.0%
2019 63 days +0.0%

Georgia compared with similar countries

  • Georgia's 63 days is below the median for upper middle income countries, which is 131 days, 48% of the median. (55 countries reporting)
  • Georgia's 63 days is below the median for Europe & Central Asia, which is 156 days, 40% of the median. (49 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 135.3 days 90.5 days 197.5 days 5
2010s 68.65 days 63 days 90.5 days 10

Countries ranked near Georgia

  1. 178 Jordan 66 days compare
  2. 179 Finland 65 days compare
  3. 180 Denmark 64 days compare
  4. 182 Morocco 58 days compare
  5. 183 Samoa 57 days compare
  6. 184 United Arab Emirates 47.5 days compare

See the full ranking of 188 places →

More private sector data for Georgia

All data for Georgia →

Frequently asked questions

What is dealing with construction permits: time in Georgia?
Dealing with construction permits: time in Georgia was 63 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Georgia?
The highest recorded value was 197.5 days in 2005.
What is the lowest dealing with construction permits: time recorded in Georgia?
The lowest recorded value was 63 days in 2013.
How does Georgia rank for dealing with construction permits: time?
Georgia ranks 181st out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Georgia?
Over the last ten years it is down 30.4%. The long-run trend across the full record is falling.
Where does this Georgia data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Georgia. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/georgia/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/georgia/">Dealing with construction permits: Time in Georgia</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.