Finland vs Jordan: Dealing with construction permits: Time

Finland
65 days
in 2019
Jordan
66 days
in 2019
Finland rank
176th
Jordan rank
175th

Dealing with construction permits: Time over time

  • Finland
  • Jordan
020406080100200520122019

How they compare

Jordan currently reports 66 days against 65 days in Finland, a difference of 1 days.

Across all 15 years both countries report, Jordan has been ahead every year.

Finland ranks 176th and Jordan ranks 175th of 185 countries.

Jordan has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Finland Jordan Difference Ahead
2000s 64 days 89.4 days 25.4 days Jordan
2010s 64.6 days 66.3 days 1.7 days Jordan

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Finland or Jordan?
Jordan, at 66 days against 65 days in Finland as of 2019.
What is the difference in dealing with construction permits: time between Finland and Jordan?
1 days, with Jordan ahead.
How many years of comparable data are there for Finland and Jordan?
15 years are reported by both, from 2005 to 2019.
How do Finland and Jordan rank globally for dealing with construction permits: time?
Finland ranks 176th and Jordan ranks 175th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.