Dealing with construction permits: Time in Jordan

Jordan: Dealing with construction permits: Time was 66 days in 2019. ▼ Falling

Latest (2019)
66 days
Change on year
unchanged
World rank
175th
of 185 countries
All-time high
95 days
in 2005
All-time low
66 days
in 2013
Years of data
15
2005–2019

Dealing with construction permits: Time in Jordan, 2005–2019

0204060801002005201220192005: 95 days2006: 95 days2007: 95 days2008: 95 days2009: 67 days2010: 67 days2011: 67 days2012: 67 days2013: 66 days2014: 66 days2015: 66 days2016: 66 days2017: 66 days2018: 66 days2019: 66 days

Source: World Bank. Measured in days.

Analysis

Jordan recorded 66 days for dealing with construction permits: time in 2019. That is the lowest value across all 15 years on record.

That represents a change of down 1.5% over ten years.

Over the whole period, dealing with construction permits: time in Jordan peaked at 95 days in 2005 and was at its lowest, 66 days, in 2013.

That places Jordan 175th out of 185 countries with data for 2019, putting it in the bottom quarter.

The long-run direction has been consistently falling across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 89.4 days 67 days 95 days 5
2010s 66.3 days 66 days 67 days 10

Countries ranked near Jordan

  1. 172 Burundi 70 days compare
  2. 173 Hong Kong 69 days compare
  3. 174 Sao Tome and Principe 67 days compare
  4. 176 Finland 65 days compare
  5. 177 Denmark 64 days compare
  6. 178 Georgia 63 days compare

See the full ranking of 187 places →

More private sector data for Jordan

All data for Jordan →

Frequently asked questions

What is dealing with construction permits: time in Jordan?
Dealing with construction permits: time in Jordan was 66 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Jordan?
The highest recorded value was 95 days in 2005.
What is the lowest dealing with construction permits: time recorded in Jordan?
The lowest recorded value was 66 days in 2013.
How does Jordan rank for dealing with construction permits: time?
Jordan ranks 175th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Jordan?
Over the last ten years it is down 1.5%. The long-run trend across the full record is falling.
Where does this Jordan data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.