Finland vs Sao Tome and Principe: Dealing with construction permits: Time

Finland
65 days
in 2019
Sao Tome and Principe
67 days
in 2019
Finland rank
179th
Sao Tome and Principe rank
177th

Dealing with construction permits: Time over time

  • Finland
  • Sao Tome and Principe
50100150200200520122019

How they compare

Sao Tome and Principe currently reports 67 days against 65 days in Finland, a difference of 2 days.

Across all 15 years both countries report, Sao Tome and Principe has been ahead every year.

Finland ranks 179th and Sao Tome and Principe ranks 177th of 188 countries.

Sao Tome and Principe has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Finland Sao Tome and Principe Difference Ahead
2000s 64 days 221 days 157 days Sao Tome and Principe
2010s 64.6 days 86.6 days 22 days Sao Tome and Principe

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Finland or Sao Tome and Principe?
Sao Tome and Principe, at 67 days against 65 days in Finland as of 2019.
What is the difference in dealing with construction permits: time between Finland and Sao Tome and Principe?
2 days, with Sao Tome and Principe ahead.
How many years of comparable data are there for Finland and Sao Tome and Principe?
15 years are reported by both, from 2005 to 2019.
How do Finland and Sao Tome and Principe rank globally for dealing with construction permits: time?
Finland ranks 179th and Sao Tome and Principe ranks 177th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Finland vs Sao Tome and Principe: Dealing with construction permits: Time. Statizoid. Retrieved 24 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/finland/sao-tome-and-principe/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/finland/sao-tome-and-principe/">Finland vs Sao Tome and Principe: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.