Dealing with construction permits: Time in Sao Tome and Principe

Sao Tome and Principe: Dealing with construction permits: Time was 67 days in 2019. ◆ Volatile

Latest (2019)
67 days
Change on year
unchanged
World rank
174th
of 185 countries
All-time high
221 days
in 2005
All-time low
67 days
in 2017
Years of data
15
2005–2019

Dealing with construction permits: Time in Sao Tome and Principe, 2005–2019

501001502002005201220192005: 221 days2006: 221 days2007: 221 days2008: 221 days2009: 221 days2010: 221 days2011: 74 days2012: 74 days2013: 74 days2014: 74 days2015: 74 days2016: 74 days2017: 67 days2018: 67 days2019: 67 days

Source: World Bank. Measured in days.

Analysis

In 2019, dealing with construction permits: time in Sao Tome and Principe stood at 67 days. That is the lowest value across all 15 years on record.

Compared with earlier readings it is down 69.7% over ten years.

Over the whole period, dealing with construction permits: time in Sao Tome and Principe peaked at 221 days in 2005 and was at its lowest, 67 days, in 2017.

That places Sao Tome and Principe 174th out of 185 countries with data for 2019, putting it in the bottom quarter.

The series is highly variable year to year, so single readings are best treated with caution.

Averages by decade

DecadeAverage LowestHighest Years
2000s 221 days 221 days 221 days 5
2010s 86.6 days 67 days 221 days 10

Countries ranked near Sao Tome and Principe

  1. 171 Bahrain 71 days compare
  2. 172 Burundi 70 days compare
  3. 173 Hong Kong 69 days compare
  4. 175 Jordan 66 days compare
  5. 176 Finland 65 days compare
  6. 177 Denmark 64 days compare

See the full ranking of 187 places →

More private sector data for Sao Tome and Principe

All data for Sao Tome and Principe →

Frequently asked questions

What is dealing with construction permits: time in Sao Tome and Principe?
Dealing with construction permits: time in Sao Tome and Principe was 67 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Sao Tome and Principe?
The highest recorded value was 221 days in 2005.
What is the lowest dealing with construction permits: time recorded in Sao Tome and Principe?
The lowest recorded value was 67 days in 2017.
How does Sao Tome and Principe rank for dealing with construction permits: time?
Sao Tome and Principe ranks 174th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Sao Tome and Principe?
Over the last ten years it is down 69.7%. The long-run trend across the full record is volatile.
Where does this Sao Tome and Principe data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.