France vs Timor-Leste: Dealing with construction permits: Time

France
213 days
in 2019
Timor-Leste
207 days
in 2019
France rank
30th
Timor-Leste rank
33rd

Dealing with construction permits: Time over time

  • France
  • Timor-Leste
050100150200200520122019

How they compare

France currently reports 213 days against 207 days in Timor-Leste, a difference of 6 days.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Timor-Leste ahead.

France ranks 30th and Timor-Leste ranks 33rd of 185 countries.

Timor-Leste has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade France Timor-Leste Difference Ahead
2000s 189.4 days 207 days 17.6 days Timor-Leste
2010s 189 days 207 days 18 days Timor-Leste

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, France or Timor-Leste?
France, at 213 days against 207 days in Timor-Leste as of 2019.
What is the difference in dealing with construction permits: time between France and Timor-Leste?
6 days, with France ahead.
How many years of comparable data are there for France and Timor-Leste?
15 years are reported by both, from 2005 to 2019.
How do France and Timor-Leste rank globally for dealing with construction permits: time?
France ranks 30th and Timor-Leste ranks 33rd of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.