Dealing with construction permits: Time in East Timor
East Timor: Dealing with construction permits: Time was 207 days in 2019. ▬ Flat
Dealing with construction permits: Time in East Timor, 2005–2019
Source: World Bank. Measured in days.
Analysis
In 2019, dealing with construction permits: time in East Timor stood at 207 days. That is the highest value across all 15 years on record.
The figure is unchanged over ten years.
Over the whole period, dealing with construction permits: time in East Timor peaked at 207 days in 2005 and was at its lowest, 207 days, in 2005.
That places East Timor 33rd out of 185 countries with data for 2019, putting it in the top quarter.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 207 days | 207 days | 207 days | 5 |
| 2010s | 207 days | 207 days | 207 days | 10 |
Countries ranked near East Timor
More private sector data for East Timor
- Merchandise trade 56.9% (2025)
- Food imports 28.1% (2023)
- Manufactures imports 49.6% (2023)
- Merchandise imports 979.00 million current US$ (2025)
- Food exports 10.5% (2023)
- Manufactures exports 21.9% (2023)
- Merchandise exports 103.00 million current US$ (2025)
- Commercial service exports 132.58 million current US$ (2025)
- Transport services 31.3% (2025)
- Computer, communications and other services 11.4% (2025)
Frequently asked questions
- What is dealing with construction permits: time in East Timor?
- Dealing with construction permits: time in East Timor was 207 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in East Timor?
- The highest recorded value was 207 days in 2005.
- What is the lowest dealing with construction permits: time recorded in East Timor?
- The lowest recorded value was 207 days in 2005.
- How does East Timor rank for dealing with construction permits: time?
- East Timor ranks 33rd out of 185 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in East Timor?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this East Timor data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.