Ghana vs Togo: Dealing with construction permits: Time

Ghana
170 days
in 2019
Togo
168.5 days
in 2019
Ghana rank
59th
Togo rank
60th

Dealing with construction permits: Time over time

  • Ghana
  • Togo
0100200300200520122019

How they compare

Ghana currently reports 170 days against 168.5 days in Togo, a difference of 1.5 days.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Togo ahead.

Ghana ranks 59th and Togo ranks 60th of 185 countries.

Togo has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Ghana Togo Difference Ahead
2000s 215 days 306 days 91 days Togo
2010s 188 days 210.35 days 22.35 days Togo

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Ghana or Togo?
Ghana, at 170 days against 168.5 days in Togo as of 2019.
What is the difference in dealing with construction permits: time between Ghana and Togo?
1.5 days, with Ghana ahead.
How many years of comparable data are there for Ghana and Togo?
15 years are reported by both, from 2005 to 2019.
How do Ghana and Togo rank globally for dealing with construction permits: time?
Ghana ranks 59th and Togo ranks 60th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.