Dealing with construction permits: Time in Ghana

Ghana: Dealing with construction permits: Time was 170 days in 2019. ▼ Falling

Latest (2019)
170 days
Change on year
unchanged
World rank
59th
of 185 countries
All-time high
215 days
in 2005
All-time low
170 days
in 2014
Years of data
15
2005–2019

Dealing with construction permits: Time in Ghana, 2005–2019

0501001502002005201220192005: 215 days2006: 215 days2007: 215 days2008: 215 days2009: 215 days2010: 215 days2011: 215 days2012: 215 days2013: 215 days2014: 170 days2015: 170 days2016: 170 days2017: 170 days2018: 170 days2019: 170 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in Ghana is 170 days, measured in 2019. That is the lowest value across all 15 years on record.

Compared with earlier readings it is down 20.9% over ten years.

Over the whole period, dealing with construction permits: time in Ghana peaked at 215 days in 2005 and was at its lowest, 170 days, in 2014.

Ghana ranks 59th of 185 countries on this measure, in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 215 days 215 days 215 days 5
2010s 188 days 170 days 215 days 10

Countries ranked near Ghana

  1. 56 Senegal 177 days compare
  2. 57 Egypt 173 days compare
  3. 57 Gambia 173 days compare
  4. 60 Togo 168.5 days compare
  5. 61 Iraq 167 days compare
  6. 61 Kyrgyzstan 167 days compare

See the full ranking of 187 places →

More private sector data for Ghana

All data for Ghana →

Frequently asked questions

What is dealing with construction permits: time in Ghana?
Dealing with construction permits: time in Ghana was 170 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Ghana?
The highest recorded value was 215 days in 2005.
What is the lowest dealing with construction permits: time recorded in Ghana?
The lowest recorded value was 170 days in 2014.
How does Ghana rank for dealing with construction permits: time?
Ghana ranks 59th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Ghana?
Over the last ten years it is down 20.9%. The long-run trend across the full record is falling.
Where does this Ghana data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.