Guinea vs Malawi: Dealing with construction permits: Time

Guinea
151 days
in 2019
Malawi
153 days
in 2019
Guinea rank
79th
Malawi rank
78th

Dealing with construction permits: Time over time

  • Guinea
  • Malawi
050100150200200520122019

How they compare

Malawi currently reports 153 days against 151 days in Guinea, a difference of 2 days.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Guinea ahead.

Guinea ranks 79th and Malawi ranks 78th of 185 countries.

Guinea has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Guinea Malawi Difference Ahead
2000s 181 days 153 days 28 days Guinea
2010s 173.1 days 153 days 20.1 days Guinea

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Guinea or Malawi?
Malawi, at 153 days against 151 days in Guinea as of 2019.
What is the difference in dealing with construction permits: time between Guinea and Malawi?
2 days, with Malawi ahead.
How many years of comparable data are there for Guinea and Malawi?
15 years are reported by both, from 2005 to 2019.
How do Guinea and Malawi rank globally for dealing with construction permits: time?
Guinea ranks 79th and Malawi ranks 78th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.