Dealing with construction permits: Time in Guinea

Guinea: Dealing with construction permits: Time was 151 days in 2019. ▼ Falling

Latest (2019)
151 days
Change on year
unchanged
World rank
79th
of 185 countries
All-time high
182 days
in 2016
All-time low
151 days
in 2018
Years of data
15
2005–2019

Dealing with construction permits: Time in Guinea, 2005–2019

0501001502002005201220192005: 181 days2006: 181 days2007: 181 days2008: 181 days2009: 181 days2010: 181 days2011: 181 days2012: 181 days2013: 181 days2014: 181 days2015: 181 days2016: 182 days2017: 161 days2018: 151 days2019: 151 days

Source: World Bank. Measured in days.

Analysis

Guinea recorded 151 days for dealing with construction permits: time in 2019. That is the lowest value across all 15 years on record.

The figure is down 16.6% over ten years.

Over the whole period, dealing with construction permits: time in Guinea peaked at 182 days in 2016 and was at its lowest, 151 days, in 2018.

That places Guinea 79th out of 185 countries with data for 2019, putting it in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 181 days 181 days 181 days 5
2010s 173.1 days 151 days 182 days 10

Countries ranked near Guinea

  1. 76 Luxembourg 155 days compare
  2. 76 South Africa 155 days compare
  3. 78 Malawi 153 days compare
  4. 80 Bhutan 150 days compare
  5. 81 Spain 147 days compare
  6. 82 Croatia 146 days compare
  7. 82 Grenada 146 days compare

See the full ranking of 187 places →

More private sector data for Guinea

All data for Guinea →

Frequently asked questions

What is dealing with construction permits: time in Guinea?
Dealing with construction permits: time in Guinea was 151 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Guinea?
The highest recorded value was 182 days in 2016.
What is the lowest dealing with construction permits: time recorded in Guinea?
The lowest recorded value was 151 days in 2018.
How does Guinea rank for dealing with construction permits: time?
Guinea ranks 79th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Guinea?
Over the last ten years it is down 16.6%. The long-run trend across the full record is falling.
Where does this Guinea data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.