Haiti vs Mauritius: Dealing with construction permits: Time

Haiti
97 days
in 2019
Mauritius
95.5 days
in 2019
Haiti rank
146th
Mauritius rank
149th

Dealing with construction permits: Time over time

  • Haiti
  • Mauritius
50100150200250300200520122019

How they compare

Haiti currently reports 97 days against 95.5 days in Mauritius, a difference of 1.5 days.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Mauritius ahead.

Haiti ranks 146th and Mauritius ranks 149th of 185 countries.

Mauritius has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Haiti Mauritius Difference Ahead
2000s 121 days 261.6 days 140.6 days Mauritius
2010s 95.9 days 184.15 days 88.25 days Mauritius

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Haiti or Mauritius?
Haiti, at 97 days against 95.5 days in Mauritius as of 2019.
What is the difference in dealing with construction permits: time between Haiti and Mauritius?
1.5 days, with Haiti ahead.
How many years of comparable data are there for Haiti and Mauritius?
15 years are reported by both, from 2005 to 2019.
How do Haiti and Mauritius rank globally for dealing with construction permits: time?
Haiti ranks 146th and Mauritius ranks 149th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.