Dealing with construction permits: Time in Mauritius

Mauritius: Dealing with construction permits: Time was 95.5 days in 2019. ▼ Falling

Latest (2019)
95.5 days
Change on year
down 2.6%
World rank
149th
of 185 countries
All-time high
282 days
in 2005
All-time low
95.5 days
in 2019
Years of data
15
2005–2019

Dealing with construction permits: Time in Mauritius, 2005–2019

1001502002503002005201220192005: 282 days2006: 282 days2007: 248 days2008: 248 days2009: 248 days2010: 248 days2011: 248 days2012: 248 days2013: 248 days2014: 246 days2015: 156 days2016: 156 days2017: 98 days2018: 98 days2019: 95.5 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in Mauritius is 95.5 days, measured in 2019. That is the lowest value across all 15 years on record.

That represents a change of down 2.6% on the previous year and down 61.5% over ten years.

Over the whole period, dealing with construction permits: time in Mauritius peaked at 282 days in 2005 and was at its lowest, 95.5 days, in 2019.

That places Mauritius 149th out of 185 countries with data for 2019, putting it in the bottom quarter.

The long-run direction has been consistently falling across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 261.6 days 248 days 282 days 5
2010s 184.15 days 95.5 days 248 days 10

Countries ranked near Mauritius

  1. 146 Bulgaria 97 days compare
  2. 146 Haiti 97 days compare
  3. 146 Rwanda 97 days compare
  4. 150 New Zealand 93 days compare
  5. 151 Lao PDR 92 days compare
  6. 151 St. Vincent and the Grenadines 92 days compare

See the full ranking of 187 places →

More private sector data for Mauritius

All data for Mauritius →

Frequently asked questions

What is dealing with construction permits: time in Mauritius?
Dealing with construction permits: time in Mauritius was 95.5 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Mauritius?
The highest recorded value was 282 days in 2005.
What is the lowest dealing with construction permits: time recorded in Mauritius?
The lowest recorded value was 95.5 days in 2019.
How does Mauritius rank for dealing with construction permits: time?
Mauritius ranks 149th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Mauritius?
Over the last ten years it is down 61.5%. The long-run trend across the full record is falling.
Where does this Mauritius data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.