Haiti vs Solomon Islands: Dealing with construction permits: Time

Haiti
97 days
in 2019
Solomon Islands
99 days
in 2019
Haiti rank
146th
Solomon Islands rank
143rd

Dealing with construction permits: Time over time

  • Haiti
  • Solomon Islands
0255075100125200520122019

How they compare

Solomon Islands currently reports 99 days against 97 days in Haiti, a difference of 2 days.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Haiti ahead.

Haiti ranks 146th and Solomon Islands ranks 143rd of 185 countries.

Across the 2 decades both report, Haiti averaged higher in 1 and Solomon Islands in 1.

Head to head by decade

Decade Haiti Solomon Islands Difference Ahead
2000s 121 days 99 days 22 days Haiti
2010s 95.9 days 99 days 3.1 days Solomon Islands

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Haiti or Solomon Islands?
Solomon Islands, at 99 days against 97 days in Haiti as of 2019.
What is the difference in dealing with construction permits: time between Haiti and Solomon Islands?
2 days, with Solomon Islands ahead.
How many years of comparable data are there for Haiti and Solomon Islands?
15 years are reported by both, from 2005 to 2019.
How do Haiti and Solomon Islands rank globally for dealing with construction permits: time?
Haiti ranks 146th and Solomon Islands ranks 143rd of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.