Dealing with construction permits: Time in Solomon Islands

Solomon Islands: Dealing with construction permits: Time was 99 days in 2019. ▬ Flat

Latest (2019)
99 days
Change on year
unchanged
World rank
143rd
of 185 countries
All-time high
99 days
in 2005
All-time low
99 days
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Time in Solomon Islands, 2005–2019

0204060801002005201220192005: 99 days2006: 99 days2007: 99 days2008: 99 days2009: 99 days2010: 99 days2011: 99 days2012: 99 days2013: 99 days2014: 99 days2015: 99 days2016: 99 days2017: 99 days2018: 99 days2019: 99 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in Solomon Islands is 99 days, measured in 2019. That is the highest value across all 15 years on record.

Compared with earlier readings it is unchanged over ten years.

Over the whole period, dealing with construction permits: time in Solomon Islands peaked at 99 days in 2005 and was at its lowest, 99 days, in 2005.

Solomon Islands ranks 143rd of 185 countries on this measure, in the bottom quarter.

Averages by decade

DecadeAverage LowestHighest Years
2000s 99 days 99 days 99 days 5
2010s 99 days 99 days 99 days 10

Countries ranked near Solomon Islands

  1. 140 Saudi Arabia 100 days compare
  2. 140 Turkey 100 days compare
  3. 142 Serbia 99.5 days compare
  4. 143 Armenia 99 days compare
  5. 145 Niger 98 days compare
  6. 146 Bulgaria 97 days compare
  7. 146 Haiti 97 days compare
  8. 146 Rwanda 97 days compare

See the full ranking of 187 places →

More private sector data for Solomon Islands

All data for Solomon Islands →

Frequently asked questions

What is dealing with construction permits: time in Solomon Islands?
Dealing with construction permits: time in Solomon Islands was 99 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Solomon Islands?
The highest recorded value was 99 days in 2005.
What is the lowest dealing with construction permits: time recorded in Solomon Islands?
The lowest recorded value was 99 days in 2005.
How does Solomon Islands rank for dealing with construction permits: time?
Solomon Islands ranks 143rd out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Solomon Islands?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Solomon Islands data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.