Dealing with construction permits: Time in Solomon Islands
Solomon Islands: Dealing with construction permits: Time was 99 days in 2019. ▬ Flat
Dealing with construction permits: Time in Solomon Islands, 2005–2019
Source: World Bank. Measured in days.
Analysis
The most recent figure for dealing with construction permits: time in Solomon Islands is 99 days, measured in 2019. That is the highest value across all 15 years on record.
Compared with earlier readings it is unchanged over ten years.
Over the whole period, dealing with construction permits: time in Solomon Islands peaked at 99 days in 2005 and was at its lowest, 99 days, in 2005.
Solomon Islands ranks 143rd of 185 countries on this measure, in the bottom quarter.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 99 days | 99 days | 99 days | 5 |
| 2010s | 99 days | 99 days | 99 days | 10 |
Countries ranked near Solomon Islands
More private sector data for Solomon Islands
- Merchandise trade 83.8% (2025)
- Food imports 22.2% (2018)
- Manufactures imports 59.9% (2018)
- Merchandise imports 790.00 million current US$ (2025)
- Food exports 20.1% (2018)
- Manufactures exports 2.2% (2018)
- Merchandise exports 677.00 million current US$ (2025)
- Commercial service exports 122.73 million current US$ (2024)
- Transport services 32.8% (2024)
- Computer, communications and other services 44.8% (2024)
Frequently asked questions
- What is dealing with construction permits: time in Solomon Islands?
- Dealing with construction permits: time in Solomon Islands was 99 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in Solomon Islands?
- The highest recorded value was 99 days in 2005.
- What is the lowest dealing with construction permits: time recorded in Solomon Islands?
- The lowest recorded value was 99 days in 2005.
- How does Solomon Islands rank for dealing with construction permits: time?
- Solomon Islands ranks 143rd out of 185 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in Solomon Islands?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Solomon Islands data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.