India vs Nigeria: Dealing with construction permits: Time (days) (Time days)

India
106.22 days
in 2019
Nigeria
104.79 days
in 2019
India rank
132nd
Nigeria rank
135th

Dealing with construction permits: Time (days) (Time days) over time

  • India
  • Nigeria
050100150200200520122019

How they compare

India currently reports 106.22 days against 104.79 days in Nigeria, a difference of 1.43 days.

Across all 15 years both countries report, India has been ahead every year.

India ranks 132nd and Nigeria ranks 135th of 188 countries.

India has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade India Nigeria Difference Ahead
2000s 202 days 124 days 78 days India
2010s 166.8 days 110.55 days 56.24 days India

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, India or Nigeria?
India, at 106.22 days against 104.79 days in Nigeria as of 2019.
What is the difference in dealing with construction permits: time between India and Nigeria?
1.43 days, with India ahead.
How many years of comparable data are there for India and Nigeria?
15 years are reported by both, from 2005 to 2019.
How do India and Nigeria rank globally for dealing with construction permits: time?
India ranks 132nd and Nigeria ranks 135th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

India vs Nigeria: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/india/nigeria/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/india/nigeria/">India vs Nigeria: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.