Dealing with construction permits: Time (days) (Time days) in India

India: Dealing with construction permits: Time was 106.22 days in 2019. ▼ Falling

Latest (2019)
106.22 days
Change on year
down 1.7%
World rank
132nd
of 188 countries
All-time high
202 days
in 2005
All-time low
106.22 days
in 2019
Years of data
15
2005–2019

Dealing with construction permits: Time in India, 2005–2019

0501001502002005201220192005: 202 days2006: 202 days2007: 202 days2008: 202 days2009: 202 days2010: 202 days2011: 202 days2012: 171 days2013: 183.7 days2014: 183.7 days2015: 183.7 days2016: 183.7 days2017: 143.9 days2018: 108 days2019: 106.2 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in India is 106.22 days, measured in 2019. That is the lowest value across all 15 years on record.

Compared with earlier readings it is down 1.7% on the previous year and down 47.4% over ten years.

Over the whole period, dealing with construction permits: time in India peaked at 202 days in 2005 and was at its lowest, 106.22 days, in 2019.

India ranks 132nd of 188 countries on this measure, in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Dealing with construction permits: Time in India, year by year

Annual values for Dealing with construction permits: Time (days) in India, 2005 to 2019.
Year days Change
2005 202 days —
2006 202 days +0.0%
2007 202 days +0.0%
2008 202 days +0.0%
2009 202 days +0.0%
2010 202 days +0.0%
2011 202 days +0.0%
2012 171 days -15.3%
2013 183.72 days +7.4%
2014 183.72 days +0.0%
2015 183.72 days +0.0%
2016 183.72 days +0.0%
2017 143.87 days -21.7%
2018 108.01 days -24.9%
2019 106.22 days -1.7%

India compared with similar countries

  • India's 106.22 days is below the median for lower middle income countries, which is 159 days, 67% of the median. (47 countries reporting)
  • India's 106.22 days is below the median for South Asia, which is 129 days, 82% of the median. (6 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 202 days 202 days 202 days 5
2010s 166.8 days 106.22 days 202 days 10

Countries ranked near India

  1. 129 Japan 108.35 days compare
  2. 130 Palestine 108 days compare
  3. 131 Comoros 107 days compare
  4. 133 Panama 105 days compare
  5. 133 Saint Kitts and Nevis 105 days compare
  6. 135 Nigeria 104.79 days compare

See the full ranking of 188 places →

More private sector data for India

All data for India →

Frequently asked questions

What is dealing with construction permits: time in India?
Dealing with construction permits: time in India was 106.22 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in India?
The highest recorded value was 202 days in 2005.
What is the lowest dealing with construction permits: time recorded in India?
The lowest recorded value was 106.22 days in 2019.
How does India rank for dealing with construction permits: time?
India ranks 132nd out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in India?
Over the last ten years it is down 47.4%. The long-run trend across the full record is falling.
Where does this India data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in India. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/india/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/india/">Dealing with construction permits: Time in India</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.