Dealing with construction permits: Time in India

India: Dealing with construction permits: Time was 106.22 days in 2019. ▼ Falling

Latest (2019)
106.22 days
Change on year
down 1.7%
World rank
129th
of 185 countries
All-time high
202 days
in 2005
All-time low
106.22 days
in 2019
Years of data
15
2005–2019

Dealing with construction permits: Time in India, 2005–2019

0501001502002005201220192005: 202 days2006: 202 days2007: 202 days2008: 202 days2009: 202 days2010: 202 days2011: 202 days2012: 171 days2013: 183.7 days2014: 183.7 days2015: 183.7 days2016: 183.7 days2017: 143.9 days2018: 108 days2019: 106.2 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in India is 106.22 days, measured in 2019. That is the lowest value across all 15 years on record.

Compared with earlier readings it is down 1.7% on the previous year and down 47.4% over ten years.

Over the whole period, dealing with construction permits: time in India peaked at 202 days in 2005 and was at its lowest, 106.22 days, in 2019.

India ranks 129th of 185 countries on this measure, in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 202 days 202 days 202 days 5
2010s 166.8 days 106.22 days 202 days 10

Countries ranked near India

  1. 126 Japan 108.35 days compare
  2. 127 West Bank and Gaza 108 days compare
  3. 128 Comoros 107 days compare
  4. 130 Panama 105 days compare
  5. 130 St. Kitts and Nevis 105 days compare
  6. 132 Nigeria 104.79 days compare

See the full ranking of 187 places →

More private sector data for India

All data for India →

Frequently asked questions

What is dealing with construction permits: time in India?
Dealing with construction permits: time in India was 106.22 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in India?
The highest recorded value was 202 days in 2005.
What is the lowest dealing with construction permits: time recorded in India?
The lowest recorded value was 106.22 days in 2019.
How does India rank for dealing with construction permits: time?
India ranks 129th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in India?
Over the last ten years it is down 47.4%. The long-run trend across the full record is falling.
Where does this India data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.