Indonesia vs East Timor: Dealing with construction permits: Time

Indonesia
200.13 days
in 2019
East Timor
207 days
in 2019
Indonesia rank
35th
East Timor rank
33rd

Dealing with construction permits: Time over time

  • Indonesia
  • East Timor
050100150200200520122019

How they compare

East Timor currently reports 207 days against 200.13 days in Indonesia, a difference of 6.87 days.

Across all 15 years both countries report, East Timor has been ahead every year.

Indonesia ranks 35th and East Timor ranks 33rd of 185 countries.

East Timor has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Indonesia East Timor Difference Ahead
2000s 191 days 207 days 16 days East Timor
2010s 197.45 days 207 days 9.55 days East Timor

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Indonesia or East Timor?
East Timor, at 207 days against 200.13 days in Indonesia as of 2019.
What is the difference in dealing with construction permits: time between Indonesia and East Timor?
6.87 days, with East Timor ahead.
How many years of comparable data are there for Indonesia and East Timor?
15 years are reported by both, from 2005 to 2019.
How do Indonesia and East Timor rank globally for dealing with construction permits: time?
Indonesia ranks 35th and East Timor ranks 33rd of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.