Iraq vs Puerto Rico: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Iraq
- Puerto Rico
How they compare
Iraq currently reports 167 days against 165 days in Puerto Rico, a difference of 2 days.
Across all 15 years both countries report, Iraq has been ahead every year.
Iraq ranks 61st and Puerto Rico ranks 64th of 185 countries.
Iraq has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Iraq | Puerto Rico | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 229 days | 175 days | 54 days | Iraq |
| 2010s | 204.2 days | 173.8 days | 30.4 days | Iraq |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Iraq or Puerto Rico?
- Iraq, at 167 days against 165 days in Puerto Rico as of 2019.
- What is the difference in dealing with construction permits: time between Iraq and Puerto Rico?
- 2 days, with Iraq ahead.
- How many years of comparable data are there for Iraq and Puerto Rico?
- 15 years are reported by both, from 2005 to 2019.
- How do Iraq and Puerto Rico rank globally for dealing with construction permits: time?
- Iraq ranks 61st and Puerto Rico ranks 64th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.