Dealing with construction permits: Time (days) (Time days) in Iraq

Iraq: Dealing with construction permits: Time was 167 days in 2019. ▼ Falling

Latest (2019)
167 days
Change on year
unchanged
World rank
63rd
of 188 countries
All-time high
229 days
in 2005
All-time low
167 days
in 2016
Years of data
15
2005–2019

Dealing with construction permits: Time in Iraq, 2005–2019

0501001502002502005201220192005: 229 days2006: 229 days2007: 229 days2008: 229 days2009: 229 days2010: 229 days2011: 229 days2012: 229 days2013: 229 days2014: 229 days2015: 229 days2016: 167 days2017: 167 days2018: 167 days2019: 167 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in Iraq is 167 days, measured in 2019. That is the lowest value across all 15 years on record.

The figure is down 27.1% over ten years.

Over the whole period, dealing with construction permits: time in Iraq peaked at 229 days in 2005 and was at its lowest, 167 days, in 2016.

That places Iraq 63rd out of 188 countries with data for 2019, putting it in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Dealing with construction permits: Time in Iraq, year by year

Annual values for Dealing with construction permits: Time (days) in Iraq, 2005 to 2019.
Year days Change
2005 229 days —
2006 229 days +0.0%
2007 229 days +0.0%
2008 229 days +0.0%
2009 229 days +0.0%
2010 229 days +0.0%
2011 229 days +0.0%
2012 229 days +0.0%
2013 229 days +0.0%
2014 229 days +0.0%
2015 229 days +0.0%
2016 167 days -27.1%
2017 167 days +0.0%
2018 167 days +0.0%
2019 167 days +0.0%

Iraq compared with similar countries

  • Iraq's 167 days is above the median for upper middle income countries, which is 131 days, 1.3× the median. (55 countries reporting)
  • Iraq's 167 days is above the median for Middle East, North Africa, Afghanistan & Pakistan, which is 127.5 days, 1.3× the median. (22 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 229 days 229 days 229 days 5
2010s 204.2 days 167 days 229 days 10

Countries ranked near Iraq

  1. 61 Ghana 170 days compare
  2. 62 Togo 168.5 days compare
  3. 63 Kyrgyzstan 167 days compare
  4. 65 Vietnam 166 days compare
  5. 66 Puerto Rico 165 days compare

See the full ranking of 188 places →

More private sector data for Iraq

All data for Iraq →

Frequently asked questions

What is dealing with construction permits: time in Iraq?
Dealing with construction permits: time in Iraq was 167 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Iraq?
The highest recorded value was 229 days in 2005.
What is the lowest dealing with construction permits: time recorded in Iraq?
The lowest recorded value was 167 days in 2016.
How does Iraq rank for dealing with construction permits: time?
Iraq ranks 63rd out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Iraq?
Over the last ten years it is down 27.1%. The long-run trend across the full record is falling.
Where does this Iraq data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Iraq. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/iraq/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/iraq/">Dealing with construction permits: Time in Iraq</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.