Jamaica vs Peru: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Jamaica
- Peru
How they compare
Jamaica currently reports 140.5 days against 137 days in Peru, a difference of 3.5 days.
The two have swapped places 6 times across 15 shared years of data; in 2005 it was Jamaica ahead.
Jamaica ranks 90th and Peru ranks 93rd of 185 countries.
Across the 2 decades both report, Jamaica averaged higher in 1 and Peru in 1.
Head to head by decade
| Decade | Jamaica | Peru | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 228 days | 197 days | 31 days | Jamaica |
| 2010s | 159.55 days | 161 days | 1.45 days | Peru |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Jamaica or Peru?
- Jamaica, at 140.5 days against 137 days in Peru as of 2019.
- What is the difference in dealing with construction permits: time between Jamaica and Peru?
- 3.5 days, with Jamaica ahead.
- How many years of comparable data are there for Jamaica and Peru?
- 15 years are reported by both, from 2005 to 2019.
- How do Jamaica and Peru rank globally for dealing with construction permits: time?
- Jamaica ranks 90th and Peru ranks 93rd of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.