Dealing with construction permits: Time in Jamaica

Jamaica: Dealing with construction permits: Time was 140.5 days in 2019. ▼ Falling

Latest (2019)
140.5 days
Change on year
unchanged
World rank
90th
of 185 countries
All-time high
260 days
in 2005
All-time low
140.5 days
in 2015
Years of data
15
2005–2019

Dealing with construction permits: Time in Jamaica, 2005–2019

01002003002005201220192005: 260 days2006: 260 days2007: 260 days2008: 180 days2009: 180 days2010: 191 days2011: 180.5 days2012: 180.5 days2013: 170.5 days2014: 170.5 days2015: 140.5 days2016: 140.5 days2017: 140.5 days2018: 140.5 days2019: 140.5 days

Source: World Bank. Measured in days.

Analysis

In 2019, dealing with construction permits: time in Jamaica stood at 140.5 days. That is the lowest value across all 15 years on record.

That represents a change of down 21.9% over ten years.

Over the whole period, dealing with construction permits: time in Jamaica peaked at 260 days in 2005 and was at its lowest, 140.5 days, in 2015.

Jamaica ranks 90th of 185 countries on this measure, in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 228 days 180 days 260 days 5
2010s 159.55 days 140.5 days 191 days 10

Countries ranked near Jamaica

  1. 87 Guinea-Bissau 143 days compare
  2. 88 Belize 142 days compare
  3. 89 Fiji 141 days compare
  4. 91 Maldives 140 days compare
  5. 92 Costa Rica 138 days compare
  6. 93 Mongolia 137 days compare
  7. 93 Peru 137 days compare
  8. 93 Poland 137 days compare

See the full ranking of 187 places →

More private sector data for Jamaica

All data for Jamaica →

Frequently asked questions

What is dealing with construction permits: time in Jamaica?
Dealing with construction permits: time in Jamaica was 140.5 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Jamaica?
The highest recorded value was 260 days in 2005.
What is the lowest dealing with construction permits: time recorded in Jamaica?
The lowest recorded value was 140.5 days in 2015.
How does Jamaica rank for dealing with construction permits: time?
Jamaica ranks 90th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Jamaica?
Over the last ten years it is down 21.9%. The long-run trend across the full record is falling.
Where does this Jamaica data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.