Japan vs Norway: Dealing with construction permits: Time

Japan
108.35 days
in 2019
Norway
109.5 days
in 2019
Japan rank
126th
Norway rank
125th

Dealing with construction permits: Time over time

  • Japan
  • Norway
050100150200250200520122019

How they compare

Norway currently reports 109.5 days against 108.35 days in Japan, a difference of 1.15 days.

Across all 15 years both countries report, Norway has been ahead every year.

Japan ranks 126th and Norway ranks 125th of 185 countries.

Norway has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Japan Norway Difference Ahead
2000s 170 days 235.5 days 65.5 days Norway
2010s 108.25 days 134.7 days 26.45 days Norway

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Japan or Norway?
Norway, at 109.5 days against 108.35 days in Japan as of 2019.
What is the difference in dealing with construction permits: time between Japan and Norway?
1.15 days, with Norway ahead.
How many years of comparable data are there for Japan and Norway?
15 years are reported by both, from 2005 to 2019.
How do Japan and Norway rank globally for dealing with construction permits: time?
Japan ranks 126th and Norway ranks 125th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.