Dealing with construction permits: Time in Norway

Norway: Dealing with construction permits: Time was 109.5 days in 2019. ▼ Falling

Latest (2019)
109.5 days
Change on year
unchanged
World rank
125th
of 185 countries
All-time high
235.5 days
in 2005
All-time low
109.5 days
in 2012
Years of data
15
2005–2019

Dealing with construction permits: Time in Norway, 2005–2019

0501001502002502005201220192005: 235.5 days2006: 235.5 days2007: 235.5 days2008: 235.5 days2009: 235.5 days2010: 235.5 days2011: 235.5 days2012: 109.5 days2013: 109.5 days2014: 109.5 days2015: 109.5 days2016: 109.5 days2017: 109.5 days2018: 109.5 days2019: 109.5 days

Source: World Bank. Measured in days.

Analysis

In 2019, dealing with construction permits: time in Norway stood at 109.5 days. That is the lowest value across all 15 years on record.

The figure is down 53.5% over ten years.

Over the whole period, dealing with construction permits: time in Norway peaked at 235.5 days in 2005 and was at its lowest, 109.5 days, in 2012.

That places Norway 125th out of 185 countries with data for 2019, putting it in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 235.5 days 235.5 days 235.5 days 5
2010s 134.7 days 109.5 days 235.5 days 10

Countries ranked near Norway

  1. 124 China 110.88 days compare
  2. 126 Japan 108.35 days compare
  3. 127 West Bank and Gaza 108 days compare
  4. 128 Comoros 107 days compare

See the full ranking of 187 places →

More private sector data for Norway

All data for Norway →

Frequently asked questions

What is dealing with construction permits: time in Norway?
Dealing with construction permits: time in Norway was 109.5 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Norway?
The highest recorded value was 235.5 days in 2005.
What is the lowest dealing with construction permits: time recorded in Norway?
The lowest recorded value was 109.5 days in 2012.
How does Norway rank for dealing with construction permits: time?
Norway ranks 125th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Norway?
Over the last ten years it is down 53.5%. The long-run trend across the full record is falling.
Where does this Norway data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.