Dealing with construction permits: Time (days) (Time days) in Norway

Norway: Dealing with construction permits: Time was 109.5 days in 2019. ▼ Falling

Latest (2019)
109.5 days
Change on year
unchanged
World rank
128th
of 188 countries
All-time high
235.5 days
in 2005
All-time low
109.5 days
in 2012
Years of data
15
2005–2019

Dealing with construction permits: Time in Norway, 2005–2019

0501001502002502005201220192005: 235.5 days2006: 235.5 days2007: 235.5 days2008: 235.5 days2009: 235.5 days2010: 235.5 days2011: 235.5 days2012: 109.5 days2013: 109.5 days2014: 109.5 days2015: 109.5 days2016: 109.5 days2017: 109.5 days2018: 109.5 days2019: 109.5 days

Source: World Bank. Measured in days.

Analysis

In 2019, dealing with construction permits: time in Norway stood at 109.5 days. That is the lowest value across all 15 years on record.

The figure is down 53.5% over ten years.

Over the whole period, dealing with construction permits: time in Norway peaked at 235.5 days in 2005 and was at its lowest, 109.5 days, in 2012.

That places Norway 128th out of 188 countries with data for 2019, putting it in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Dealing with construction permits: Time in Norway, year by year

Annual values for Dealing with construction permits: Time (days) in Norway, 2005 to 2019.
Year days Change
2005 235.5 days —
2006 235.5 days +0.0%
2007 235.5 days +0.0%
2008 235.5 days +0.0%
2009 235.5 days +0.0%
2010 235.5 days +0.0%
2011 235.5 days +0.0%
2012 109.5 days -53.5%
2013 109.5 days +0.0%
2014 109.5 days +0.0%
2015 109.5 days +0.0%
2016 109.5 days +0.0%
2017 109.5 days +0.0%
2018 109.5 days +0.0%
2019 109.5 days +0.0%

Norway compared with similar countries

  • Norway's 109.5 days is below the median for high income countries, which is 144.75 days, 76% of the median. (62 countries reporting)
  • Norway's 109.5 days is below the median for Europe & Central Asia, which is 156 days, 70% of the median. (49 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 235.5 days 235.5 days 235.5 days 5
2010s 134.7 days 109.5 days 235.5 days 10

Countries ranked near Norway

  1. 127 China 110.88 days compare
  2. 129 Japan 108.35 days compare
  3. 130 Palestine 108 days compare
  4. 131 Comoros 107 days compare

See the full ranking of 188 places →

More private sector data for Norway

All data for Norway →

Frequently asked questions

What is dealing with construction permits: time in Norway?
Dealing with construction permits: time in Norway was 109.5 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Norway?
The highest recorded value was 235.5 days in 2005.
What is the lowest dealing with construction permits: time recorded in Norway?
The lowest recorded value was 109.5 days in 2012.
How does Norway rank for dealing with construction permits: time?
Norway ranks 128th out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Norway?
Over the last ten years it is down 53.5%. The long-run trend across the full record is falling.
Where does this Norway data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Norway. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/norway/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/norway/">Dealing with construction permits: Time in Norway</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.