Korea, Rep. vs Marshall Islands: Dealing with construction permits: Time

Korea, Rep.
27.5 days
in 2019
Marshall Islands
38 days
in 2019
Korea, Rep. rank
185th
Marshall Islands rank
183rd

Dealing with construction permits: Time over time

  • Korea, Rep.
  • Marshall Islands
0204060200520122019

How they compare

Marshall Islands currently reports 38 days against 27.5 days in Korea, Rep., a difference of 10.5 days.

That makes Marshall Islands's figure about 1.4 times Korea, Rep.'s.

Across all 15 years both countries report, Marshall Islands has been ahead every year.

Korea, Rep. ranks 185th and Marshall Islands ranks 183rd of 185 countries.

Marshall Islands has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Korea, Rep. Marshall Islands Difference Ahead
2000s 30.2 days 53 days 22.8 days Marshall Islands
2010s 27.65 days 41 days 13.35 days Marshall Islands

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Korea, Rep. or Marshall Islands?
Marshall Islands, at 38 days against 27.5 days in Korea, Rep. as of 2019.
What is the difference in dealing with construction permits: time between Korea, Rep. and Marshall Islands?
10.5 days, with Marshall Islands ahead.
How many years of comparable data are there for Korea, Rep. and Marshall Islands?
15 years are reported by both, from 2005 to 2019.
How do Korea, Rep. and Marshall Islands rank globally for dealing with construction permits: time?
Korea, Rep. ranks 185th and Marshall Islands ranks 183rd of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.