South Korea: Dealing with construction permits: Time was 27.5 days in 2019. ▼ Falling
Dealing with construction permits: Time in South Korea, 2005–2019
Source: World Bank. Measured in days.
Analysis
South Korea recorded 27.5 days for dealing with construction permits: time in 2019.
Compared with earlier readings it is up 1.9% over ten years.
Over the whole period, dealing with construction permits: time in South Korea peaked at 43 days in 2005 and was at its lowest, 27 days, in 2006.
That places South Korea 185th out of 185 countries with data for 2019, putting it in the bottom quarter.
The long-run direction has been consistently falling across the 15 years of available data.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 30.2 days | 27 days | 43 days | 5 |
| 2010s | 27.65 days | 27 days | 28 days | 10 |
Countries ranked near South Korea
More private sector data for South Korea
- Merchandise trade 71.6% (2025)
- Food imports 6.3% (2024)
- Manufactures imports 60.1% (2024)
- Merchandise imports 631.89 billion current US$ (2025)
- Food exports 1.6% (2024)
- Manufactures exports 87.3% (2024)
- Merchandise exports 709.33 billion current US$ (2025)
- Commercial service exports 149.31 billion current US$ (2025)
- Transport services 19.5% (2025)
- Computer, communications and other services 57.4% (2025)
Frequently asked questions
- What is dealing with construction permits: time in South Korea?
- Dealing with construction permits: time in South Korea was 27.5 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in South Korea?
- The highest recorded value was 43 days in 2005.
- What is the lowest dealing with construction permits: time recorded in South Korea?
- The lowest recorded value was 27 days in 2006.
- How does South Korea rank for dealing with construction permits: time?
- South Korea ranks 185th out of 185 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in South Korea?
- Over the last ten years it is up 1.9%. The long-run trend across the full record is falling.
- Where does this South Korea data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.