Kuwait vs Nigeria: Dealing with construction permits: Time

Kuwait
103 days
in 2019
Nigeria
104.79 days
in 2019
Kuwait rank
134th
Nigeria rank
132nd

Dealing with construction permits: Time over time

  • Kuwait
  • Nigeria
050100150200200520122019

How they compare

Nigeria currently reports 104.79 days against 103 days in Kuwait, a difference of 1.79 days.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Kuwait ahead.

Kuwait ranks 134th and Nigeria ranks 132nd of 185 countries.

Kuwait has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Kuwait Nigeria Difference Ahead
2000s 183 days 124 days 59 days Kuwait
2010s 182.5 days 110.55 days 71.95 days Kuwait

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Kuwait or Nigeria?
Nigeria, at 104.79 days against 103 days in Kuwait as of 2019.
What is the difference in dealing with construction permits: time between Kuwait and Nigeria?
1.79 days, with Nigeria ahead.
How many years of comparable data are there for Kuwait and Nigeria?
15 years are reported by both, from 2005 to 2019.
How do Kuwait and Nigeria rank globally for dealing with construction permits: time?
Kuwait ranks 134th and Nigeria ranks 132nd of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.