Dealing with construction permits: Time (days) (Time days) in Kuwait

Kuwait: Dealing with construction permits: Time was 103 days in 2019. ▼ Falling

Latest (2019)
103 days
Change on year
down 46.9%
World rank
137th
of 188 countries
All-time high
199 days
in 2014
All-time low
103 days
in 2019
Years of data
15
2005–2019

Dealing with construction permits: Time in Kuwait, 2005–2019

0501001502002005201220192005: 183 days2006: 183 days2007: 183 days2008: 183 days2009: 183 days2010: 183 days2011: 183 days2012: 183 days2013: 183 days2014: 199 days2015: 199 days2016: 199 days2017: 199 days2018: 194 days2019: 103 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in Kuwait is 103 days, measured in 2019. That is the lowest value across all 15 years on record.

The figure is down 46.9% on the previous year and down 43.7% over ten years.

Over the whole period, dealing with construction permits: time in Kuwait peaked at 199 days in 2014 and was at its lowest, 103 days, in 2019.

Kuwait ranks 137th of 188 countries on this measure, in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Dealing with construction permits: Time in Kuwait, year by year

Annual values for Dealing with construction permits: Time (days) in Kuwait, 2005 to 2019.
Year days Change
2005 183 days —
2006 183 days +0.0%
2007 183 days +0.0%
2008 183 days +0.0%
2009 183 days +0.0%
2010 183 days +0.0%
2011 183 days +0.0%
2012 183 days +0.0%
2013 183 days +0.0%
2014 199 days +8.7%
2015 199 days +0.0%
2016 199 days +0.0%
2017 199 days +0.0%
2018 194 days -2.5%
2019 103 days -46.9%

Kuwait compared with similar countries

  • Kuwait's 103 days is below the median for high income countries, which is 144.75 days, 71% of the median. (62 countries reporting)
  • Kuwait's 103 days is below the median for Middle East, North Africa, Afghanistan & Pakistan, which is 127.5 days, 81% of the median. (22 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 183 days 183 days 183 days 5
2010s 182.5 days 103 days 199 days 10

Countries ranked near Kuwait

  1. 135 Nigeria 104.79 days compare
  2. 136 Mauritania 104 days compare
  3. 137 Estonia 103 days compare
  4. 139 Kazakhstan 102.5 days compare
  5. 140 Botswana 102 days compare
  6. 140 Montenegro 102 days compare

See the full ranking of 188 places →

More private sector data for Kuwait

All data for Kuwait →

Frequently asked questions

What is dealing with construction permits: time in Kuwait?
Dealing with construction permits: time in Kuwait was 103 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Kuwait?
The highest recorded value was 199 days in 2014.
What is the lowest dealing with construction permits: time recorded in Kuwait?
The lowest recorded value was 103 days in 2019.
How does Kuwait rank for dealing with construction permits: time?
Kuwait ranks 137th out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Kuwait?
Over the last ten years it is down 43.7%. The long-run trend across the full record is falling.
Where does this Kuwait data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Kuwait. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/kuwait/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/kuwait/">Dealing with construction permits: Time in Kuwait</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.