Dealing with construction permits: Time in Kuwait
Kuwait: Dealing with construction permits: Time was 103 days in 2019. ▼ Falling
Dealing with construction permits: Time in Kuwait, 2005–2019
Source: World Bank. Measured in days.
Analysis
The most recent figure for dealing with construction permits: time in Kuwait is 103 days, measured in 2019. That is the lowest value across all 15 years on record.
The figure is down 46.9% on the previous year and down 43.7% over ten years.
Over the whole period, dealing with construction permits: time in Kuwait peaked at 199 days in 2014 and was at its lowest, 103 days, in 2019.
Kuwait ranks 134th of 185 countries on this measure, in the middle of the range.
The long-run direction has been consistently falling across the 15 years of available data.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 183 days | 183 days | 183 days | 5 |
| 2010s | 182.5 days | 103 days | 199 days | 10 |
Countries ranked near Kuwait
- 132 Nigeria 104.79 days compare
- 133 Mauritania 104 days compare
- 134 Estonia 103 days compare
- 136 Kazakhstan 102.5 days compare
- 137 Botswana 102 days compare
- 137 Montenegro 102 days compare
More private sector data for Kuwait
- Merchandise trade 72.3% (2025)
- Food imports 17.5% (2024)
- Manufactures imports 73.2% (2024)
- Merchandise imports 41.61 billion current US$ (2025)
- Food exports 0.6% (2024)
- Manufactures exports 8.1% (2024)
- Merchandise exports 72.07 billion current US$ (2025)
- Commercial service exports 12.14 billion current US$ (2025)
- Transport services 21.8% (2025)
- Computer, communications and other services 24.8% (2025)
Frequently asked questions
- What is dealing with construction permits: time in Kuwait?
- Dealing with construction permits: time in Kuwait was 103 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in Kuwait?
- The highest recorded value was 199 days in 2014.
- What is the lowest dealing with construction permits: time recorded in Kuwait?
- The lowest recorded value was 103 days in 2019.
- How does Kuwait rank for dealing with construction permits: time?
- Kuwait ranks 134th out of 185 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in Kuwait?
- Over the last ten years it is down 43.7%. The long-run trend across the full record is falling.
- Where does this Kuwait data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.