Kyrgyzstan vs Puerto Rico: Dealing with construction permits: Time

Kyrgyzstan
167 days
in 2019
Puerto Rico
165 days
in 2019
Kyrgyzstan rank
62nd
Puerto Rico rank
65th

Dealing with construction permits: Time over time

  • Kyrgyzstan
  • Puerto Rico
0100200300400200520122019

How they compare

Kyrgyzstan currently reports 167 days against 165 days in Puerto Rico, a difference of 2 days.

The two have swapped places 2 times across 15 shared years of data; in 2005 it was Kyrgyzstan ahead.

Kyrgyzstan ranks 62nd and Puerto Rico ranks 65th of 187 countries.

Across the 2 decades both report, Kyrgyzstan averaged higher in 1 and Puerto Rico in 1.

Head to head by decade

Decade Kyrgyzstan Puerto Rico Difference Ahead
2000s 313.2 days 175 days 138.2 days Kyrgyzstan
2010s 163.4 days 173.8 days 10.4 days Puerto Rico

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Kyrgyzstan or Puerto Rico?
Kyrgyzstan, at 167 days against 165 days in Puerto Rico as of 2019.
What is the difference in dealing with construction permits: time between Kyrgyzstan and Puerto Rico?
2 days, with Kyrgyzstan ahead.
How many years of comparable data are there for Kyrgyzstan and Puerto Rico?
15 years are reported by both, from 2005 to 2019.
How do Kyrgyzstan and Puerto Rico rank globally for dealing with construction permits: time?
Kyrgyzstan ranks 62nd and Puerto Rico ranks 65th of 187 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Kyrgyzstan vs Puerto Rico: Dealing with construction permits: Time. Statizoid. Retrieved 22 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/kyrgyz-republic/puerto-rico-us/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/kyrgyz-republic/puerto-rico-us/">Kyrgyzstan vs Puerto Rico: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.