Dealing with construction permits: Time (days) (Time days) in Kyrgyzstan

Kyrgyzstan: Dealing with construction permits: Time was 167 days in 2019. ▼ Falling

Latest (2019)
167 days
Change on year
unchanged
World rank
63rd
of 188 countries
All-time high
409 days
in 2005
All-time low
158 days
in 2009
Years of data
15
2005–2019

Dealing with construction permits: Time in Kyrgyzstan, 2005–2019

01002003004002005201220192005: 409 days2006: 409 days2007: 409 days2008: 181 days2009: 158 days2010: 158 days2011: 158 days2012: 158 days2013: 158 days2014: 167 days2015: 167 days2016: 167 days2017: 167 days2018: 167 days2019: 167 days

Source: World Bank. Measured in days.

Analysis

In 2019, dealing with construction permits: time in Kyrgyzstan stood at 167 days.

The figure is up 5.7% over ten years.

Over the whole period, dealing with construction permits: time in Kyrgyzstan peaked at 409 days in 2005 and was at its lowest, 158 days, in 2009.

Kyrgyzstan ranks 63rd of 188 countries on this measure, in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Dealing with construction permits: Time in Kyrgyzstan, year by year

Annual values for Dealing with construction permits: Time (days) in Kyrgyzstan, 2005 to 2019.
Year days Change
2005 409 days —
2006 409 days +0.0%
2007 409 days +0.0%
2008 181 days -55.7%
2009 158 days -12.7%
2010 158 days +0.0%
2011 158 days +0.0%
2012 158 days +0.0%
2013 158 days +0.0%
2014 167 days +5.7%
2015 167 days +0.0%
2016 167 days +0.0%
2017 167 days +0.0%
2018 167 days +0.0%
2019 167 days +0.0%

Kyrgyzstan compared with similar countries

  • Kyrgyzstan's 167 days is above the median for lower middle income countries, which is 159 days, 1.1× the median. (47 countries reporting)
  • Kyrgyzstan's 167 days is above the median for Europe & Central Asia, which is 156 days, 1.1× the median. (49 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 313.2 days 158 days 409 days 5
2010s 163.4 days 158 days 167 days 10

Countries ranked near Kyrgyzstan

  1. 61 Ghana 170 days compare
  2. 62 Togo 168.5 days compare
  3. 63 Iraq 167 days compare
  4. 65 Vietnam 166 days compare
  5. 66 Puerto Rico 165 days compare

See the full ranking of 188 places →

More private sector data for Kyrgyzstan

All data for Kyrgyzstan →

Frequently asked questions

What is dealing with construction permits: time in Kyrgyzstan?
Dealing with construction permits: time in Kyrgyzstan was 167 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Kyrgyzstan?
The highest recorded value was 409 days in 2005.
What is the lowest dealing with construction permits: time recorded in Kyrgyzstan?
The lowest recorded value was 158 days in 2009.
How does Kyrgyzstan rank for dealing with construction permits: time?
Kyrgyzstan ranks 63rd out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Kyrgyzstan?
Over the last ten years it is up 5.7%. The long-run trend across the full record is falling.
Where does this Kyrgyzstan data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Kyrgyzstan. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/kyrgyz-republic/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/kyrgyz-republic/">Dealing with construction permits: Time in Kyrgyzstan</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.