Dealing with construction permits: Time in Kyrgyz Republic

Kyrgyz Republic: Dealing with construction permits: Time was 167 days in 2019. ▼ Falling

Latest (2019)
167 days
Change on year
unchanged
World rank
61st
of 185 countries
All-time high
409 days
in 2005
All-time low
158 days
in 2009
Years of data
15
2005–2019

Dealing with construction permits: Time in Kyrgyz Republic, 2005–2019

01002003004002005201220192005: 409 days2006: 409 days2007: 409 days2008: 181 days2009: 158 days2010: 158 days2011: 158 days2012: 158 days2013: 158 days2014: 167 days2015: 167 days2016: 167 days2017: 167 days2018: 167 days2019: 167 days

Source: World Bank. Measured in days.

Analysis

In 2019, dealing with construction permits: time in Kyrgyz Republic stood at 167 days.

The figure is up 5.7% over ten years.

Over the whole period, dealing with construction permits: time in Kyrgyz Republic peaked at 409 days in 2005 and was at its lowest, 158 days, in 2009.

Kyrgyz Republic ranks 61st of 185 countries on this measure, in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 313.2 days 158 days 409 days 5
2010s 163.4 days 158 days 167 days 10

Countries ranked near Kyrgyz Republic

  1. 59 Ghana 170 days compare
  2. 60 Togo 168.5 days compare
  3. 61 Iraq 167 days compare
  4. 63 Viet Nam 166 days compare
  5. 64 Puerto Rico (US) 165 days compare

See the full ranking of 187 places →

More private sector data for Kyrgyz Republic

All data for Kyrgyz Republic →

Frequently asked questions

What is dealing with construction permits: time in Kyrgyz Republic?
Dealing with construction permits: time in Kyrgyz Republic was 167 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Kyrgyz Republic?
The highest recorded value was 409 days in 2005.
What is the lowest dealing with construction permits: time recorded in Kyrgyz Republic?
The lowest recorded value was 158 days in 2009.
How does Kyrgyz Republic rank for dealing with construction permits: time?
Kyrgyz Republic ranks 61st out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Kyrgyz Republic?
Over the last ten years it is up 5.7%. The long-run trend across the full record is falling.
Where does this Kyrgyz Republic data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.