Lao PDR vs Mauritius: Dealing with construction permits: Time

Lao PDR
92 days
in 2019
Mauritius
95.5 days
in 2019
Lao PDR rank
151st
Mauritius rank
149th

Dealing with construction permits: Time over time

  • Lao PDR
  • Mauritius
100150200250300200520122019

How they compare

Mauritius currently reports 95.5 days against 92 days in Lao PDR, a difference of 3.5 days.

Across all 15 years both countries report, Mauritius has been ahead every year.

Lao PDR ranks 151st and Mauritius ranks 149th of 185 countries.

Mauritius has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Lao PDR Mauritius Difference Ahead
2000s 86 days 261.6 days 175.6 days Mauritius
2010s 89.3 days 184.15 days 94.85 days Mauritius

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Lao PDR or Mauritius?
Mauritius, at 95.5 days against 92 days in Lao PDR as of 2019.
What is the difference in dealing with construction permits: time between Lao PDR and Mauritius?
3.5 days, with Mauritius ahead.
How many years of comparable data are there for Lao PDR and Mauritius?
15 years are reported by both, from 2005 to 2019.
How do Lao PDR and Mauritius rank globally for dealing with construction permits: time?
Lao PDR ranks 151st and Mauritius ranks 149th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.