Lao People’s Democratic Republic vs New Zealand: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Lao People’s Democratic Republic
- New Zealand
How they compare
New Zealand currently reports 93 days against 92 days in Lao People’s Democratic Republic, a difference of 1 days.
The two have swapped places 1 time across 15 shared years of data; in 2005 it was Lao People’s Democratic Republic ahead.
Lao People’s Democratic Republic ranks 153rd and New Zealand ranks 152nd of 187 countries.
New Zealand has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Lao People’s Democratic Republic | New Zealand | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 86 days | 93 days | 7 days | New Zealand |
| 2010s | 89.3 days | 93 days | 3.7 days | New Zealand |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Lao People’s Democratic Republic or New Zealand?
- New Zealand, at 93 days against 92 days in Lao People’s Democratic Republic as of 2019.
- What is the difference in dealing with construction permits: time between Lao People’s Democratic Republic and New Zealand?
- 1 days, with New Zealand ahead.
- How many years of comparable data are there for Lao People’s Democratic Republic and New Zealand?
- 15 years are reported by both, from 2005 to 2019.
- How do Lao People’s Democratic Republic and New Zealand rank globally for dealing with construction permits: time?
- Lao People’s Democratic Republic ranks 153rd and New Zealand ranks 152nd of 187 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.