Laos vs New Zealand: Dealing with construction permits: Time (days) (Time days)

Laos
92 days
in 2019
New Zealand
93 days
in 2019
Laos rank
154th
New Zealand rank
153rd

Dealing with construction permits: Time (days) (Time days) over time

  • Laos
  • New Zealand
020406080100200520122019

How they compare

New Zealand currently reports 93 days against 92 days in Laos, a difference of 1 days.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Laos ahead.

Laos ranks 154th and New Zealand ranks 153rd of 188 countries.

New Zealand has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Laos New Zealand Difference Ahead
2000s 86 days 93 days 7 days New Zealand
2010s 89.3 days 93 days 3.7 days New Zealand

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Laos or New Zealand?
New Zealand, at 93 days against 92 days in Laos as of 2019.
What is the difference in dealing with construction permits: time between Laos and New Zealand?
1 days, with New Zealand ahead.
How many years of comparable data are there for Laos and New Zealand?
15 years are reported by both, from 2005 to 2019.
How do Laos and New Zealand rank globally for dealing with construction permits: time?
Laos ranks 154th and New Zealand ranks 153rd of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Laos vs New Zealand: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/lao-pdr/new-zealand/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/lao-pdr/new-zealand/">Laos vs New Zealand: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.