Dealing with construction permits: Time (days) (Time days) in New Zealand

New Zealand: Dealing with construction permits: Time was 93 days in 2019. ▬ Flat

Latest (2019)
93 days
Change on year
unchanged
World rank
153rd
of 188 countries
All-time high
93 days
in 2005
All-time low
93 days
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Time in New Zealand, 2005–2019

0204060801002005201220192005: 93 days2006: 93 days2007: 93 days2008: 93 days2009: 93 days2010: 93 days2011: 93 days2012: 93 days2013: 93 days2014: 93 days2015: 93 days2016: 93 days2017: 93 days2018: 93 days2019: 93 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in New Zealand is 93 days, measured in 2019. That is the highest value across all 15 years on record.

That represents a change of unchanged over ten years.

Over the whole period, dealing with construction permits: time in New Zealand peaked at 93 days in 2005 and was at its lowest, 93 days, in 2005.

New Zealand ranks 153rd of 188 countries on this measure, in the bottom quarter.

Dealing with construction permits: Time in New Zealand, year by year

Annual values for Dealing with construction permits: Time (days) in New Zealand, 2005 to 2019.
Year days Change
2005 93 days —
2006 93 days +0.0%
2007 93 days +0.0%
2008 93 days +0.0%
2009 93 days +0.0%
2010 93 days +0.0%
2011 93 days +0.0%
2012 93 days +0.0%
2013 93 days +0.0%
2014 93 days +0.0%
2015 93 days +0.0%
2016 93 days +0.0%
2017 93 days +0.0%
2018 93 days +0.0%
2019 93 days +0.0%

New Zealand compared with similar countries

  • New Zealand's 93 days is below the median for high income countries, which is 144.75 days, 64% of the median. (62 countries reporting)
  • New Zealand's 93 days is below the median for East Asia & Pacific, which is 103.67 days, 90% of the median. (28 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 93 days 93 days 93 days 5
2010s 93 days 93 days 93 days 10

Countries ranked near New Zealand

  1. 152 Mauritius 95.5 days compare
  2. 154 Laos 92 days compare
  3. 154 Saint Vincent and the Grenadines 92 days compare
  4. 156 North Macedonia 91 days compare

See the full ranking of 188 places →

More private sector data for New Zealand

All data for New Zealand →

Frequently asked questions

What is dealing with construction permits: time in New Zealand?
Dealing with construction permits: time in New Zealand was 93 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in New Zealand?
The highest recorded value was 93 days in 2005.
What is the lowest dealing with construction permits: time recorded in New Zealand?
The lowest recorded value was 93 days in 2005.
How does New Zealand rank for dealing with construction permits: time?
New Zealand ranks 153rd out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in New Zealand?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this New Zealand data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in New Zealand. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/new-zealand/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/new-zealand/">Dealing with construction permits: Time in New Zealand</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.