Laos vs Saint Vincent and the Grenadines: Dealing with construction permits: Time (days) (Time days)

Laos
92 days
in 2019
Saint Vincent and the Grenadines
92 days
in 2019
Laos rank
154th
Saint Vincent and the Grenadines rank
154th

Dealing with construction permits: Time (days) (Time days) over time

  • Laos
  • Saint Vincent and the Grenadines
020406080100200520122019

How they compare

Laos currently reports 92 days against 92 days in Saint Vincent and the Grenadines, a difference of 0 days.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Laos ahead.

Laos ranks 154th and Saint Vincent and the Grenadines ranks 154th of 188 countries.

Across the 2 decades both report, Laos averaged higher in 1 and Saint Vincent and the Grenadines in 1.

Head to head by decade

Decade Laos Saint Vincent and the Grenadines Difference Ahead
2000s 86 days 82 days 4 days Laos
2010s 89.3 days 89.9 days 0.6 days Saint Vincent and the Grenadines

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Laos or Saint Vincent and the Grenadines?
Laos, at 92 days against 92 days in Saint Vincent and the Grenadines as of 2019.
What is the difference in dealing with construction permits: time between Laos and Saint Vincent and the Grenadines?
0 days, with Laos ahead.
How many years of comparable data are there for Laos and Saint Vincent and the Grenadines?
15 years are reported by both, from 2005 to 2019.
How do Laos and Saint Vincent and the Grenadines rank globally for dealing with construction permits: time?
Laos ranks 154th and Saint Vincent and the Grenadines ranks 154th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Laos vs Saint Vincent and the Grenadines: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/lao-pdr/st-vincent-and-the-grenadines/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/lao-pdr/st-vincent-and-the-grenadines/">Laos vs Saint Vincent and the Grenadines: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.