Dealing with construction permits: Time in St. Vincent and the Grenadines

St. Vincent and the Grenadines: Dealing with construction permits: Time was 92 days in 2019. ▲ Rising

Latest (2019)
92 days
Change on year
unchanged
World rank
151st
of 185 countries
All-time high
92 days
in 2012
All-time low
81 days
in 2011
Years of data
15
2005–2019

Dealing with construction permits: Time in St. Vincent and the Grenadines, 2005–2019

0204060801002005201220192005: 82 days2006: 82 days2007: 82 days2008: 82 days2009: 82 days2010: 82 days2011: 81 days2012: 92 days2013: 92 days2014: 92 days2015: 92 days2016: 92 days2017: 92 days2018: 92 days2019: 92 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in St. Vincent and the Grenadines is 92 days, measured in 2019. That is the highest value across all 15 years on record.

The figure is up 12.2% over ten years.

Over the whole period, dealing with construction permits: time in St. Vincent and the Grenadines peaked at 92 days in 2012 and was at its lowest, 81 days, in 2011.

That places St. Vincent and the Grenadines 151st out of 185 countries with data for 2019, putting it in the bottom quarter.

The long-run direction has been consistently rising across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 82 days 82 days 82 days 5
2010s 89.9 days 81 days 92 days 10

Countries ranked near St. Vincent and the Grenadines

  1. 149 Mauritius 95.5 days compare
  2. 150 New Zealand 93 days compare
  3. 151 Lao PDR 92 days compare
  4. 153 North Macedonia 91 days compare
  5. 154 Palau 90 days compare

See the full ranking of 187 places →

More private sector data for St. Vincent and the Grenadines

All data for St. Vincent and the Grenadines →

Frequently asked questions

What is dealing with construction permits: time in St. Vincent and the Grenadines?
Dealing with construction permits: time in St. Vincent and the Grenadines was 92 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in St. Vincent and the Grenadines?
The highest recorded value was 92 days in 2012.
What is the lowest dealing with construction permits: time recorded in St. Vincent and the Grenadines?
The lowest recorded value was 81 days in 2011.
How does St. Vincent and the Grenadines rank for dealing with construction permits: time?
St. Vincent and the Grenadines ranks 151st out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in St. Vincent and the Grenadines?
Over the last ten years it is up 12.2%. The long-run trend across the full record is rising.
Where does this St. Vincent and the Grenadines data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.