Dealing with construction permits: Time (days) (Time days) in Saint Vincent and the Grenadines

Saint Vincent and the Grenadines: Dealing with construction permits: Time was 92 days in 2019. ▲ Rising

Latest (2019)
92 days
Change on year
unchanged
World rank
154th
of 188 countries
All-time high
92 days
in 2012
All-time low
81 days
in 2011
Years of data
15
2005–2019

Dealing with construction permits: Time in Saint Vincent and the Grenadines, 2005–2019

0204060801002005201220192005: 82 days2006: 82 days2007: 82 days2008: 82 days2009: 82 days2010: 82 days2011: 81 days2012: 92 days2013: 92 days2014: 92 days2015: 92 days2016: 92 days2017: 92 days2018: 92 days2019: 92 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in Saint Vincent and the Grenadines is 92 days, measured in 2019. That is the highest value across all 15 years on record.

The figure is up 12.2% over ten years.

Over the whole period, dealing with construction permits: time in Saint Vincent and the Grenadines peaked at 92 days in 2012 and was at its lowest, 81 days, in 2011.

That places Saint Vincent and the Grenadines 154th out of 188 countries with data for 2019, putting it in the bottom quarter.

The long-run direction has been consistently rising across the 15 years of available data.

Dealing with construction permits: Time in Saint Vincent and the Grenadines, year by year

Annual values for Dealing with construction permits: Time (days) in Saint Vincent and the Grenadines, 2005 to 2019.
Year days Change
2005 82 days —
2006 82 days +0.0%
2007 82 days +0.0%
2008 82 days +0.0%
2009 82 days +0.0%
2010 82 days +0.0%
2011 81 days -1.2%
2012 92 days +13.6%
2013 92 days +0.0%
2014 92 days +0.0%
2015 92 days +0.0%
2016 92 days +0.0%
2017 92 days +0.0%
2018 92 days +0.0%
2019 92 days +0.0%

Saint Vincent and the Grenadines compared with similar countries

  • Saint Vincent and the Grenadines's 92 days is below the median for upper middle income countries, which is 131 days, 70% of the median. (55 countries reporting)
  • Saint Vincent and the Grenadines's 92 days is below the median for Latin America & Caribbean, which is 165 days, 56% of the median. (33 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 82 days 82 days 82 days 5
2010s 89.9 days 81 days 92 days 10

Countries ranked near Saint Vincent and the Grenadines

  1. 152 Mauritius 95.5 days compare
  2. 153 New Zealand 93 days compare
  3. 154 Laos 92 days compare
  4. 156 North Macedonia 91 days compare
  5. 157 Palau 90 days compare

See the full ranking of 188 places →

More private sector data for Saint Vincent and the Grenadines

All data for Saint Vincent and the Grenadines →

Frequently asked questions

What is dealing with construction permits: time in Saint Vincent and the Grenadines?
Dealing with construction permits: time in Saint Vincent and the Grenadines was 92 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Saint Vincent and the Grenadines?
The highest recorded value was 92 days in 2012.
What is the lowest dealing with construction permits: time recorded in Saint Vincent and the Grenadines?
The lowest recorded value was 81 days in 2011.
How does Saint Vincent and the Grenadines rank for dealing with construction permits: time?
Saint Vincent and the Grenadines ranks 154th out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Saint Vincent and the Grenadines?
Over the last ten years it is up 12.2%. The long-run trend across the full record is rising.
Where does this Saint Vincent and the Grenadines data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Saint Vincent and the Grenadines. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/st-vincent-and-the-grenadines/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/st-vincent-and-the-grenadines/">Dealing with construction permits: Time in Saint Vincent and the Grenadines</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.