Dealing with construction permits: Time in St. Vincent and the Grenadines
St. Vincent and the Grenadines: Dealing with construction permits: Time was 92 days in 2019. ▲ Rising
Dealing with construction permits: Time in St. Vincent and the Grenadines, 2005–2019
Source: World Bank. Measured in days.
Analysis
The most recent figure for dealing with construction permits: time in St. Vincent and the Grenadines is 92 days, measured in 2019. That is the highest value across all 15 years on record.
The figure is up 12.2% over ten years.
Over the whole period, dealing with construction permits: time in St. Vincent and the Grenadines peaked at 92 days in 2012 and was at its lowest, 81 days, in 2011.
That places St. Vincent and the Grenadines 151st out of 185 countries with data for 2019, putting it in the bottom quarter.
The long-run direction has been consistently rising across the 15 years of available data.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 82 days | 82 days | 82 days | 5 |
| 2010s | 89.9 days | 81 days | 92 days | 10 |
Countries ranked near St. Vincent and the Grenadines
- 149 Mauritius 95.5 days compare
- 150 New Zealand 93 days compare
- 151 Lao PDR 92 days compare
- 153 North Macedonia 91 days compare
- 154 Palau 90 days compare
More private sector data for St. Vincent and the Grenadines
- Merchandise trade 43.5% (2025)
- Food imports 26.0% (2023)
- Manufactures imports 61.3% (2023)
- Merchandise imports 509.00 million current US$ (2025)
- Food exports 72.5% (2023)
- Manufactures exports 26.6% (2023)
- Merchandise exports 37.00 million current US$ (2025)
- Commercial service exports 380.27 million current US$ (2025)
- Transport services 44.3% (2025)
- Computer, communications and other services 22.0% (2025)
Frequently asked questions
- What is dealing with construction permits: time in St. Vincent and the Grenadines?
- Dealing with construction permits: time in St. Vincent and the Grenadines was 92 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in St. Vincent and the Grenadines?
- The highest recorded value was 92 days in 2012.
- What is the lowest dealing with construction permits: time recorded in St. Vincent and the Grenadines?
- The lowest recorded value was 81 days in 2011.
- How does St. Vincent and the Grenadines rank for dealing with construction permits: time?
- St. Vincent and the Grenadines ranks 151st out of 185 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in St. Vincent and the Grenadines?
- Over the last ten years it is up 12.2%. The long-run trend across the full record is rising.
- Where does this St. Vincent and the Grenadines data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.