Malawi vs Spain: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Malawi
- Spain
How they compare
Malawi currently reports 153 days against 147 days in Spain, a difference of 6 days.
The two have swapped places 1 time across 15 shared years of data; in 2005 it was Spain ahead.
Malawi ranks 78th and Spain ranks 81st of 185 countries.
Spain has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Malawi | Spain | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 153 days | 193 days | 40 days | Spain |
| 2010s | 153 days | 161 days | 8 days | Spain |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Malawi or Spain?
- Malawi, at 153 days against 147 days in Spain as of 2019.
- What is the difference in dealing with construction permits: time between Malawi and Spain?
- 6 days, with Malawi ahead.
- How many years of comparable data are there for Malawi and Spain?
- 15 years are reported by both, from 2005 to 2019.
- How do Malawi and Spain rank globally for dealing with construction permits: time?
- Malawi ranks 78th and Spain ranks 81st of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.