Dealing with construction permits: Time in Spain

Spain: Dealing with construction permits: Time was 147 days in 2019. ▼ Falling

Latest (2019)
147 days
Change on year
unchanged
World rank
81st
of 185 countries
All-time high
193 days
in 2005
All-time low
147 days
in 2015
Years of data
15
2005–2019

Dealing with construction permits: Time in Spain, 2005–2019

0501001502002005201220192005: 193 days2006: 193 days2007: 193 days2008: 193 days2009: 193 days2010: 193 days2011: 193 days2012: 193 days2013: 148 days2014: 148 days2015: 147 days2016: 147 days2017: 147 days2018: 147 days2019: 147 days

Source: World Bank. Measured in days.

Analysis

Spain recorded 147 days for dealing with construction permits: time in 2019. That is the lowest value across all 15 years on record.

Compared with earlier readings it is down 23.8% over ten years.

Over the whole period, dealing with construction permits: time in Spain peaked at 193 days in 2005 and was at its lowest, 147 days, in 2015.

That places Spain 81st out of 185 countries with data for 2019, putting it in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 193 days 193 days 193 days 5
2010s 161 days 147 days 193 days 10

Countries ranked near Spain

  1. 78 Malawi 153 days compare
  2. 79 Guinea 151 days compare
  3. 80 Bhutan 150 days compare
  4. 82 Croatia 146 days compare
  5. 82 Grenada 146 days compare
  6. 84 San Marino 145.5 days compare

See the full ranking of 187 places →

More private sector data for Spain

All data for Spain →

Frequently asked questions

What is dealing with construction permits: time in Spain?
Dealing with construction permits: time in Spain was 147 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Spain?
The highest recorded value was 193 days in 2005.
What is the lowest dealing with construction permits: time recorded in Spain?
The lowest recorded value was 147 days in 2015.
How does Spain rank for dealing with construction permits: time?
Spain ranks 81st out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Spain?
Over the last ten years it is down 23.8%. The long-run trend across the full record is falling.
Where does this Spain data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.