Malaysia vs Marshall Islands: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Malaysia
- Marshall Islands
How they compare
Malaysia currently reports 41 days against 38 days in Marshall Islands, a difference of 3 days.
That makes Malaysia's figure about 1.1 times Marshall Islands's.
Across all 15 years both countries report, Malaysia has been ahead every year.
Malaysia ranks 182nd and Marshall Islands ranks 183rd of 185 countries.
Malaysia has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Malaysia | Marshall Islands | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 275.4 days | 53 days | 222.4 days | Malaysia |
| 2010s | 106.2 days | 41 days | 65.2 days | Malaysia |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Malaysia or Marshall Islands?
- Malaysia, at 41 days against 38 days in Marshall Islands as of 2019.
- What is the difference in dealing with construction permits: time between Malaysia and Marshall Islands?
- 3 days, with Malaysia ahead.
- How many years of comparable data are there for Malaysia and Marshall Islands?
- 15 years are reported by both, from 2005 to 2019.
- How do Malaysia and Marshall Islands rank globally for dealing with construction permits: time?
- Malaysia ranks 182nd and Marshall Islands ranks 183rd of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.