Dealing with construction permits: Time in Malaysia

Malaysia: Dealing with construction permits: Time was 41 days in 2019. ◆ Volatile

Latest (2019)
41 days
Change on year
down 2.4%
World rank
182nd
of 185 countries
All-time high
285 days
in 2005
All-time low
41 days
in 2019
Years of data
15
2005–2019

Dealing with construction permits: Time in Malaysia, 2005–2019

501001502002503002005201220192005: 285 days2006: 285 days2007: 285 days2008: 261 days2009: 261 days2010: 261 days2011: 172 days2012: 127 days2013: 109 days2014: 78 days2015: 78 days2016: 77 days2017: 77 days2018: 42 days2019: 41 days

Source: World Bank. Measured in days.

Analysis

In 2019, dealing with construction permits: time in Malaysia stood at 41 days. That is the lowest value across all 15 years on record.

That represents a change of down 2.4% on the previous year and down 84.3% over ten years.

Over the whole period, dealing with construction permits: time in Malaysia peaked at 285 days in 2005 and was at its lowest, 41 days, in 2019.

That places Malaysia 182nd out of 185 countries with data for 2019, putting it in the bottom quarter.

The series is highly variable year to year, so single readings are best treated with caution.

Averages by decade

DecadeAverage LowestHighest Years
2000s 275.4 days 261 days 285 days 5
2010s 106.2 days 41 days 261 days 10

Countries ranked near Malaysia

  1. 179 Morocco 58 days compare
  2. 180 Samoa 57 days compare
  3. 181 United Arab Emirates 47.5 days compare
  4. 183 Marshall Islands 38 days compare
  5. 184 Singapore 35.5 days compare
  6. 185 South Korea 27.5 days compare

See the full ranking of 187 places →

More private sector data for Malaysia

All data for Malaysia →

Frequently asked questions

What is dealing with construction permits: time in Malaysia?
Dealing with construction permits: time in Malaysia was 41 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Malaysia?
The highest recorded value was 285 days in 2005.
What is the lowest dealing with construction permits: time recorded in Malaysia?
The lowest recorded value was 41 days in 2019.
How does Malaysia rank for dealing with construction permits: time?
Malaysia ranks 182nd out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Malaysia?
Over the last ten years it is down 84.3%. The long-run trend across the full record is volatile.
Where does this Malaysia data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.