Dealing with construction permits: Time (days) (Time days) in Malaysia

Malaysia: Dealing with construction permits: Time was 41 days in 2019. ◆ Volatile

Latest (2019)
41 days
Change on year
down 2.4%
World rank
185th
of 188 countries
All-time high
285 days
in 2005
All-time low
41 days
in 2019
Years of data
15
2005–2019

Dealing with construction permits: Time in Malaysia, 2005–2019

501001502002503002005201220192005: 285 days2006: 285 days2007: 285 days2008: 261 days2009: 261 days2010: 261 days2011: 172 days2012: 127 days2013: 109 days2014: 78 days2015: 78 days2016: 77 days2017: 77 days2018: 42 days2019: 41 days

Source: World Bank. Measured in days.

Analysis

In 2019, dealing with construction permits: time in Malaysia stood at 41 days. That is the lowest value across all 15 years on record.

That represents a change of down 2.4% on the previous year and down 84.3% over ten years.

Over the whole period, dealing with construction permits: time in Malaysia peaked at 285 days in 2005 and was at its lowest, 41 days, in 2019.

That places Malaysia 185th out of 188 countries with data for 2019, putting it in the bottom quarter.

The series is highly variable year to year, so single readings are best treated with caution.

Dealing with construction permits: Time in Malaysia, year by year

Annual values for Dealing with construction permits: Time (days) in Malaysia, 2005 to 2019.
Year days Change
2005 285 days —
2006 285 days +0.0%
2007 285 days +0.0%
2008 261 days -8.4%
2009 261 days +0.0%
2010 261 days +0.0%
2011 172 days -34.1%
2012 127 days -26.2%
2013 109 days -14.2%
2014 78 days -28.4%
2015 78 days +0.0%
2016 77 days -1.3%
2017 77 days +0.0%
2018 42 days -45.5%
2019 41 days -2.4%

Malaysia compared with similar countries

  • Malaysia's 41 days is below the median for upper middle income countries, which is 131 days, 31% of the median. (55 countries reporting)
  • Malaysia's 41 days is below the median for East Asia & Pacific, which is 103.67 days, 40% of the median. (28 countries reporting)

Biggest year-on-year movements

Years where Dealing with construction permits: Time in Malaysia changed far more than this series normally does. A large move can be a real event or a change in how the figure was measured — the source note below says who published it.

YearChange FromTo
2018 -45.5% 77 days 42 days
2011 -34.1% 261 days 172 days
2014 -28.4% 109 days 78 days
2012 -26.2% 172 days 127 days

Averages by decade

DecadeAverage LowestHighest Years
2000s 275.4 days 261 days 285 days 5
2010s 106.2 days 41 days 261 days 10

Countries ranked near Malaysia

  1. 182 Morocco 58 days compare
  2. 183 Samoa 57 days compare
  3. 184 United Arab Emirates 47.5 days compare
  4. 186 Marshall Islands 38 days compare
  5. 187 Singapore 35.5 days compare
  6. 188 South Korea 27.5 days compare

See the full ranking of 188 places →

More private sector data for Malaysia

All data for Malaysia →

Frequently asked questions

What is dealing with construction permits: time in Malaysia?
Dealing with construction permits: time in Malaysia was 41 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Malaysia?
The highest recorded value was 285 days in 2005.
What is the lowest dealing with construction permits: time recorded in Malaysia?
The lowest recorded value was 41 days in 2019.
How does Malaysia rank for dealing with construction permits: time?
Malaysia ranks 185th out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Malaysia?
Over the last ten years it is down 84.3%. The long-run trend across the full record is volatile.
Where does this Malaysia data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Malaysia. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/malaysia/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/malaysia/">Dealing with construction permits: Time in Malaysia</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.