Maldives vs Poland: Dealing with construction permits: Time

Maldives
140 days
in 2019
Poland
137 days
in 2019
Maldives rank
91st
Poland rank
93rd

Dealing with construction permits: Time over time

  • Maldives
  • Poland
0100200300200520122019

How they compare

Maldives currently reports 140 days against 137 days in Poland, a difference of 3 days.

The two have swapped places 3 times across 15 shared years of data; in 2005 it was Poland ahead.

Maldives ranks 91st and Poland ranks 93rd of 185 countries.

Poland has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Maldives Poland Difference Ahead
2000s 140 days 273.6 days 133.6 days Poland
2010s 140 days 152.3 days 12.3 days Poland

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Maldives or Poland?
Maldives, at 140 days against 137 days in Poland as of 2019.
What is the difference in dealing with construction permits: time between Maldives and Poland?
3 days, with Maldives ahead.
How many years of comparable data are there for Maldives and Poland?
15 years are reported by both, from 2005 to 2019.
How do Maldives and Poland rank globally for dealing with construction permits: time?
Maldives ranks 91st and Poland ranks 93rd of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.