Dealing with construction permits: Time (days) (Time days) in Maldives

Maldives: Dealing with construction permits: Time was 140 days in 2019. ▬ Flat

Latest (2019)
140 days
Change on year
unchanged
World rank
94th
of 188 countries
All-time high
140 days
in 2005
All-time low
140 days
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Time in Maldives, 2005–2019

0501001502005201220192005: 140 days2006: 140 days2007: 140 days2008: 140 days2009: 140 days2010: 140 days2011: 140 days2012: 140 days2013: 140 days2014: 140 days2015: 140 days2016: 140 days2017: 140 days2018: 140 days2019: 140 days

Source: World Bank. Measured in days.

Analysis

Maldives recorded 140 days for dealing with construction permits: time in 2019. That is the highest value across all 15 years on record.

That represents a change of unchanged over ten years.

Over the whole period, dealing with construction permits: time in Maldives peaked at 140 days in 2005 and was at its lowest, 140 days, in 2005.

Maldives ranks 94th of 188 countries on this measure, in the middle of the range.

Dealing with construction permits: Time in Maldives, year by year

Annual values for Dealing with construction permits: Time (days) in Maldives, 2005 to 2019.
Year days Change
2005 140 days —
2006 140 days +0.0%
2007 140 days +0.0%
2008 140 days +0.0%
2009 140 days +0.0%
2010 140 days +0.0%
2011 140 days +0.0%
2012 140 days +0.0%
2013 140 days +0.0%
2014 140 days +0.0%
2015 140 days +0.0%
2016 140 days +0.0%
2017 140 days +0.0%
2018 140 days +0.0%
2019 140 days +0.0%

Maldives compared with similar countries

  • Maldives's 140 days is above the median for upper middle income countries, which is 131 days, 1.1× the median. (55 countries reporting)
  • Maldives's 140 days is above the median for South Asia, which is 129 days, 1.1× the median. (6 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 140 days 140 days 140 days 5
2010s 140 days 140 days 140 days 10

Countries ranked near Maldives

  1. 91 Belize 142 days compare
  2. 92 Fiji 141 days compare
  3. 93 Jamaica 140.5 days compare
  4. 95 Costa Rica 138 days compare
  5. 96 Mongolia 137 days compare
  6. 96 Peru 137 days compare
  7. 96 Poland 137 days compare

See the full ranking of 188 places →

More private sector data for Maldives

All data for Maldives →

Frequently asked questions

What is dealing with construction permits: time in Maldives?
Dealing with construction permits: time in Maldives was 140 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Maldives?
The highest recorded value was 140 days in 2005.
What is the lowest dealing with construction permits: time recorded in Maldives?
The lowest recorded value was 140 days in 2005.
How does Maldives rank for dealing with construction permits: time?
Maldives ranks 94th out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Maldives?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Maldives data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Maldives. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/maldives/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/maldives/">Dealing with construction permits: Time in Maldives</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.