Mali vs Pakistan: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Mali
- Pakistan
How they compare
Pakistan currently reports 124.9 days against 124 days in Mali, a difference of 0.9 days.
Across all 15 years both countries report, Pakistan has been ahead every year.
Mali ranks 108th and Pakistan ranks 107th of 185 countries.
Pakistan has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Mali | Pakistan | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 220.2 days | 276.2 days | 56 days | Pakistan |
| 2010s | 140 days | 263.86 days | 123.86 days | Pakistan |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Mali or Pakistan?
- Pakistan, at 124.9 days against 124 days in Mali as of 2019.
- What is the difference in dealing with construction permits: time between Mali and Pakistan?
- 0.9 days, with Pakistan ahead.
- How many years of comparable data are there for Mali and Pakistan?
- 15 years are reported by both, from 2005 to 2019.
- How do Mali and Pakistan rank globally for dealing with construction permits: time?
- Mali ranks 108th and Pakistan ranks 107th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.