Mali vs Pakistan: Dealing with construction permits: Time (days) (Time days)

Mali
124 days
in 2019
Pakistan
124.9 days
in 2019
Mali rank
111th
Pakistan rank
110th

Dealing with construction permits: Time (days) (Time days) over time

  • Mali
  • Pakistan
0100200300200520122019

How they compare

Pakistan currently reports 124.9 days against 124 days in Mali, a difference of 0.9 days.

Across all 15 years both countries report, Pakistan has been ahead every year.

Mali ranks 111th and Pakistan ranks 110th of 188 countries.

Pakistan has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Mali Pakistan Difference Ahead
2000s 220.2 days 276.2 days 56 days Pakistan
2010s 140 days 263.86 days 123.86 days Pakistan

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Mali or Pakistan?
Pakistan, at 124.9 days against 124 days in Mali as of 2019.
What is the difference in dealing with construction permits: time between Mali and Pakistan?
0.9 days, with Pakistan ahead.
How many years of comparable data are there for Mali and Pakistan?
15 years are reported by both, from 2005 to 2019.
How do Mali and Pakistan rank globally for dealing with construction permits: time?
Mali ranks 111th and Pakistan ranks 110th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Mali vs Pakistan: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/mali/pakistan/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/mali/pakistan/">Mali vs Pakistan: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.