Dealing with construction permits: Time in Pakistan

Pakistan: Dealing with construction permits: Time was 124.9 days in 2019. ▼ Falling

Latest (2019)
124.9 days
Change on year
down 56.2%
World rank
107th
of 185 countries
All-time high
285.5 days
in 2013
All-time low
124.9 days
in 2019
Years of data
15
2005–2019

Dealing with construction permits: Time in Pakistan, 2005–2019

01002003002005201220192005: 275 days2006: 275 days2007: 275 days2008: 275 days2009: 281 days2010: 267 days2011: 267 days2012: 267 days2013: 285.5 days2014: 285.5 days2015: 285.5 days2016: 285.5 days2017: 285.5 days2018: 285.1 days2019: 124.9 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in Pakistan is 124.9 days, measured in 2019. That is the lowest value across all 15 years on record.

The figure is down 56.2% on the previous year and down 55.6% over ten years.

Over the whole period, dealing with construction permits: time in Pakistan peaked at 285.5 days in 2013 and was at its lowest, 124.9 days, in 2019.

That places Pakistan 107th out of 185 countries with data for 2019, putting it in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 276.2 days 275 days 281 days 5
2010s 263.86 days 124.9 days 285.5 days 10

Countries ranked near Pakistan

  1. 104 Cameroon 126 days compare
  2. 104 Germany 126 days compare
  3. 106 Oman 125 days compare
  4. 108 Mali 124 days compare
  5. 109 Vanuatu 123 days compare
  6. 110 Democratic Republic of Congo 122 days compare

See the full ranking of 187 places →

More private sector data for Pakistan

All data for Pakistan →

Frequently asked questions

What is dealing with construction permits: time in Pakistan?
Dealing with construction permits: time in Pakistan was 124.9 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Pakistan?
The highest recorded value was 285.5 days in 2013.
What is the lowest dealing with construction permits: time recorded in Pakistan?
The lowest recorded value was 124.9 days in 2019.
How does Pakistan rank for dealing with construction permits: time?
Pakistan ranks 107th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Pakistan?
Over the last ten years it is down 55.6%. The long-run trend across the full record is falling.
Where does this Pakistan data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.