Marshall Islands vs Samoa: Dealing with construction permits: Time

Marshall Islands
38 days
in 2019
Samoa
57 days
in 2019
Marshall Islands rank
183rd
Samoa rank
180th

Dealing with construction permits: Time over time

  • Marshall Islands
  • Samoa
0204060200520122019

How they compare

Samoa currently reports 57 days against 38 days in Marshall Islands, a difference of 19 days.

That makes Samoa's figure about 1.5 times Marshall Islands's.

Across all 15 years both countries report, Samoa has been ahead every year.

Marshall Islands ranks 183rd and Samoa ranks 180th of 185 countries.

Samoa has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Marshall Islands Samoa Difference Ahead
2000s 53 days 57 days 4 days Samoa
2010s 41 days 57 days 16 days Samoa

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Marshall Islands or Samoa?
Samoa, at 57 days against 38 days in Marshall Islands as of 2019.
What is the difference in dealing with construction permits: time between Marshall Islands and Samoa?
19 days, with Samoa ahead.
How many years of comparable data are there for Marshall Islands and Samoa?
15 years are reported by both, from 2005 to 2019.
How do Marshall Islands and Samoa rank globally for dealing with construction permits: time?
Marshall Islands ranks 183rd and Samoa ranks 180th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.